BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Middletown, Connecticut. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Work required pursuant to this contract includes furnishing all labor, materials, equipment and incidentals necessary to complete the project as listed above. The project consists of the replacement of an existing wastewater pumping station including structural, mechanical, electrical, instrumentation, by-pass pumping, and related appurtenances and site improvements in strict accordance with the Contract Documents. A bid bond in the amount of ten percent (10.0%) of the total bid amount shall be required with all bids submitted. Performance and Labor and Materials Payment Bond(s) in the amount of 100% of the contract sum shall be required from the selected bidder following award. A Maintenance Bond in the amount of ten percent (10%) of the contract sum shall be required after completion of work and prior to final payment. All bids shall be submitted in duplicate on the designated forms using the Bid Return Label provided as designated in the Information for Bidders by the date set and time. Bid proposals must be executed in accordance with and are subject to the instructions contained within the Information for Bidders. The three (3) apparent lowest responsible bidders' bid bond documents may be held for a period of up to ninety (90) consecutive calendar days or until a contract is signed and then all bond documents, other than those of the successful responsible bidder shall be returned. The City of Middletown reserves the right to waive any defect or any irregularity in any bid and reserves the right to reject any or all bids or any part thereof. Bids and amendments to bids received after the time set for the bid opening will not be considered. All bids must be completely filled out when submitted. No bid may be withdrawn for a period of ninety (90) days subsequent to the opening of bids without the written consent of the City of Middletown. Withdrawal of any bid must be submitted in writing to the City of Middletown. All bids and proposals are subject to, and must comply with the equal opportunity and non-discriminatory provisions set forth in the Affirmative Action Plan of the City of Middletown.

Bid Results

Water / Sewer

$813,434.00

Public - City

Renovation, Site Work

17

19

5

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
262
Bidding Soon
4,390
All Active Projects
1,808
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2023

May 5, 2023

img_map_placeholder

Red Rd, Middletown, CT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.