BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Belfast, Maine. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The scope of work can generally be described as installation of a buried stormwater collection system and complete roadway reconstruction of Wight Street, an existing 2300 linear foot long roadway, along with addition of an 8 foot wide pathway along its entire length. Work under this project includes, but is not limited to, excavation and removal of about 5600 CY of existing roadway pavement and soils, installation of approximately 2500 linear feet of 18" to 36" diameter storm drain pipe, 32 catch basins, 7000 CY of road and pathway aggregates, 4000 LF of concrete curb, 1900 tons of pavement, erosion control, traffic control, signage, site restoration, and providing all equipment, labor and materials required to provide a complete project as defined in the contract documents. There is also an Alternate Bid which consists of installing 200 feet of sanitary sewer pipe and one manhole of Congress Street, along with trench paving and site restoration. The project must be substantially completed within 240 calendar days and complete within 270 calendar days after the execution of Notice to Proceed. An additional 21 days will be added to each contract time if Alternate 1 is awarded. A certified check or bank draft payable to the Owner or a satisfactory Bid Bond executed by the Bidder and Surety Company in an amount equal to five percent (5%) of the Bid shall be submitted with each bid. No bid may be withdrawn for at least 90 days after receipt of bids unless released by Owner. The successful bidder will be required to submit Performance and Payment Bonds, each equal to 100% of the Contractor's bid price, as specified by the General Conditions. The successful Bidder will be required to submit proof of liability insurance as specified by the General Conditions, the Supplemental General Conditions, and such construction insurance (e.g., fire extended coverage, worker's compensation, public liability and property damage, and "all risk" builders risk) as is customary and appropriate. Bidders on this work will be required to comply with the President's Executive Order No. 11246 and amendments or supplements to that Order. The requirements for bidders and contractors under this Order are explained in the Notice to Contractors. The Contractor must comply with the Department of Labor Regulations relating to Copeland "Anti-Kickback" Act (18 U.S.C. 874) as supplemented by 29 CFR part 3, Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330) as supplemented by 29 CFR part 5, and Occupational Safety and Health Standards (OSHA) (29 CFR part 1910). The Contractor must comply with all applicable standards, orders, or requirements issued under section 306 of the Clean Air Act (42 U.S.C. 1857(h)), section 508 of the Clean Water Act (33 U.S.C. 1368), Safe Drinking Water Act, Executive Order 11738, and the Environmental Protection Agency regulations (40 CFR Part 15). The Contractor must comply with all permits, restrictions and conditions, issued for the PROJECT by Federal Cross-cutting Authorities. The Contractor must comply with all Federal Requirements per the Supplementary Conditions. The Contractor must comply with requirements of the Build America, Buy America Act (BABAA) which requires that manufactured goods installed as part of this project be made in the United States. This contract is expected to be funded by a combination of City of Belfast, Maine Department of Community Development (MEOCD) Community Development Block Grant (CDBG), and United States Department of Housing and Urban Development (HUD) Economic Development Initiative (EDI) Community Project Funding. Neither the State of Maine nor the United States Federal government nor any of their departments, agencies, or employees is or will be a party to this Contract. The word "AGENCY" in the standard general conditions refers to HUD and MEOCD. The Contractor must comply with Davis-Bacon and Davis-Bacon Related Acts as stated in the CDBG/MEOCD Supplementary Conditions. All laborers and mechanics employed by the contractor and subcontractors on this project shall not be paid less than the prevailing wage rates contained in the wage determination published in the bidding documents. Any laborers and mechanics not listed in the wage determination shall be paid at least as much as the lowest wage rate for other similar trade classifications already contained in the wage determination published in the bidding documents. In order to be considered as a responsive bidder, each general contractor must be on the Engineer's bidding register by purchasing at least one set of bidding documents directly from the Engineer's office. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the contract and to complete the work contemplated therein. The successful Bidder will be required to provide both a Performance and a Payment Bond, each representing 100% of the contract value, at the time of contract execution. The Owner reserves the right to reject any or all bids, to accept any bid that it deems to be in its best interests, award the project to the "Lowest Most Responsive Bidder," and to waive any irregularities in bidding.

Bid Results

Roads / Highways

$2,062,000.00

Public - City

Paving, Site Work

45

17

4

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
8
Bidding Soon
281
All Active Projects
112
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2023

April 21, 2023

img_map_placeholder

Wight St, Belfast, ME

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.