BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Burlington, Ontario. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

This is the first phase (Phase One) of a two-phase process: the first phase will evaluate the qualifications of all interested suppliers; the second phase (Phase Two) will invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings. The qualification list will expire within 90 days or upon award of a contract in Phase Two, whichever is earlier, and the prequalification list will not be used in any other solicitation. The CCIW Burlington Sanitary system requires repairs, decommissioning of old pipe and opportunity to use existing new pipe that was used for sewage sampling. Full construction services for the installation of the underground piping, repair of the lift station. (Overall length 1.25km) - Perform test pits locates to see the locations of the underground utilities - Abandoning old water main as per the specifications - Abandoning the existing force main as per the specification - Cathodic protection of the watermains and the appurtenances - Installation of an operational valve/meter chamber as indicated on the contract drawings - Concrete removal using hydro-demolition - Waste water containment, treatment and disposal - Install Cast in Place Concrete, concrete forming and accessories - Build concrete sidewalks as required - Develop structural metal framing and perform metal fabrication - Perform mechanical demolition - Finish plumbing for sanitary chambers, drainage pipe systems, sanitary force main, bilge and sewage pumps, flushing and pressure testing - Electrical work demolition and installation - Install silt control devices and maintain during the course of construction - Placing the top soil and sod in accordance with the drawings - Protect trees with tree protection barriers - Reconfigure existing wet well - Reinstallation of water mains and insulate them. - Installation of storm and sanity sewers in accordance with the drawings The Contractor must perform and complete the Work within twenty-six (26) weeks from the date of notification of acceptance of the offer. Documents can be obtained at: http://discovery.ariba.com/rfx/15499239

Post-Bid

Water / Sewer

$2,000,000.00

Public - Federal

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
450
Active Projects
238
Bidding Soon
4,363
All Active Projects
1,714
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 21, 2023

May 22, 2023

img_map_placeholder

867 Lakeshore Rd., Burlington, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.