BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and asbestos abatement for a stadium in Molalla, Oregon. Completed plans call for the demolition of a stadium; for site work for a stadium; and for asbestos abatement for a stadium.

project includes abatement of all hazardous materials, selective deconstruction/ salvage of some materials for re-use, and demolition of existing structure including, but not limited to structural foundation. Site will be re-graded to shed water. Project is located at 150 Grange Avenue, Molalla, OR 97038 the right to: reject any and all proposals; reject any proposals not in compliance with the solicitation procedures and requirements; reject for good cause any proposal that would be in the public's best interest to do so; and waive minor irregularities in any or all proposal responses payment and performance bonds covering the faithful performance of the subcontract and the payment for all obligations arising hereunder. P&C reserves the right to consider in the evaluation the ability of proposers to provide payment and performance bonds, the associated cost of payment and performance bonds, and the current financial resources of the proposer Section 02 10 00 Hazardous Material Abatement SCOPE OF WORK: This work package includes removal of all lead and hazardous materials Includes disposal of all hazardous materials SCOPE OF WORK: This work package includes site survey as required to locate existing utilities as applicable to demo existing structure. Include provisions for permits as required to complete building demolition Include provisions for any temporary barriers, fencing, flagging to facilitate all work for this scope Coordinate and remove any mechanical or electrical to facilitate demolition. Safe off, disconnect power, and cap or seal existing utilities currently connected to and servicing existing building. Includes haul off of all debris to legally dispose of materials Demolition includes removal of all existing foundations. Temporarily regrade and infill as required to shed water and prevent ponding. Site will remain undeveloped until late 2023 or early 2024

Post-Bid

Arenas / Stadiums

$200,000.00

Public - City

Asbestos Abatement, Demolition, Site Work

9

6

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
69
Bidding Soon
1,156
All Active Projects
433
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2023

April 10, 2023

img_map_placeholder

150 Grange Ave, Molalla, OR

Related To This Project


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.