BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Montreal, Quebec. Completed plans call for the renovation of a educational facility.

Reference number : 1693539 Deadline for receipt of complaints: 2023-03-08 Submission sent electronically accepted: Yes, in a single submission document The purpose of this project is to replace a gypsum panel ceiling with a suspended ceiling in a hallway and to replace the tiles and the suspension of the suspended ceilings of a cafeteria. The work is located on the ground floor of the Decelles pavilion at HEC Montréal. Replacement of corridor ceilings (phase 1) Hallway ceiling replacement work includes the following steps: The demolition of the existing gypsum ceiling delimited by the plans; Dismantling and/or temporary suspension of certain elements (lights, cameras, Wi-Fi gateway, exit signs, etc.); The dismantling of a heat detector. This one will be condemned; The removal of access hatches and their return to the Owner; The disconnection of fluorescent tube luminaires operating on 347V, these will be condemned, and the installation of LED strips operating on 120V as a replacement solution; The partial re-gluing of 4-5 white finish panels located on the portion of the wall that is lit by fluorescent lights; Relocation of existing sprinklers to fit (centered) new frames and tiles; The supply and installation of the suspension and acoustic tiles as well as the reinstallation of the elements temporarily dismantled or suspended and updated according to the seismic requirements in force; Replacement of current recessed lights with LED recessed lights without housing and adapting to new frames and tiles; Patching of the remaining part of the gypsum ceiling; Painting the remaining gypsum sections; Approval of paraseismic systems by an OIQ engineer. Replacement of cafeteria ceilings (Phase 2 ) The cafeteria ceiling replacement work includes the following steps: The demolition of the cafeteria ceilings (suspension and acoustic tiles); The dismantling and/or temporary suspension of certain elements (grids, diffusers, light fixtures, speakers, Wi-Fi gateway, tablets, etc.); The dismantling of three (3) heat detectors. These will be condemned; The uninstallation of two current suspended luminaires and the condemnation of their power supply, they will not be replaced; Relocation of existing sprinklers to fit (centered) new frames and tiles; The supply and installation of the suspension and acoustic tiles as well as the reinstallation of the elements temporarily dismantled or suspended and updated according to the seismic requirements in force; Approval of paraseismic systems by an OIQ engineer. The work ends on June 22, 2023.

Award

Educational

$115,243.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
103
Bidding Soon
1,723
All Active Projects
696
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

April 21, 2023

img_map_placeholder

5255 Av. Decelles, Montreal, QC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.