BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Moses Lake, Washington. Completed plans call for site work for a water / sewer project.

This project includes rebuilding a total of approximately 306 Parkson Biofuser Assemblies located and operating in two aeration basins at the City's Sand Dunes Wastewater Treatment Plant located on Road K SE. The work will include removing each assembly from the existing operational aeration chains, replacing the Parkson Biofuser Sheaths (quantity five per Biofuser Assembly) and replacing other components such as O-rings, hose clamps, and downcomer hoses. Additional components may also be replaced as needed, such as complete Biofuser Assembly Counterweights. Approximately 17 Biofuser new complete assemblies may be assembled from City stock materials to replace existing assemblies. The work will require tools specialized for this type of work including a maintenance boat outfitted with a hand operated winch for raising the aeration chains Estimated Project Cost: $150,000- $300,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All bids shall be accompanied by a deposit in the form of a postal money order, cashier's check, or bond in an amount equal to 5 percent of the maximum total of the bid. The City Council reserves the right to reject any or all bids if such action is in the best interest of the City.

Award

Water / Sewer

$208,572.00

Public - City

Site Work

5

5

4

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
8
Bidding Soon
130
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

April 28, 2023

img_map_placeholder

Rd K SE, Moses Lake, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.