BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Anaheim, California. Completed plans call for site work for a transportation facility.

The Orange County Transportation Authority invites sealed bids from qualified contractors to provide Security Gates Installation at Anaheim, Garden Grove, and Santa Ana Bus Bases All requests for approved equals, clarification of specifications, or questions must be put in writing and must be received by the Authority no later than 5:00 p.m., on March 14, 2023. ANAHEIM 1717 E. VIA BURTON ANAHEIM, CA 92806 GARDEN GROVE-11790 CARDINAL CIRCLE GARDEN GROVE, CA 92843 SANTA ANA -4301 W. MACARTHUR BLVD.SANTA ANA, CA 92704 A. Contract documents: The Contractor shall obtain all copies of the Contract Drawings and Specifications including all addenda through the OCTA CAMMNET website, as required to perform the work. The cost for obtaining any additional documents required for the contractor shall be included in the bid price and no additional compensation will be allowed. B. All drawings, specifications, and other contract documents, and copies furnished by the Authority are its property. They are not to be used on other work and with the exception of signed contract sets are to be returned to the Authority upon request at the completion of the work. The location of the work, its general nature and extent, and the form and general dimensions of the project and appurtenant works are shown on the contract drawings which are hereby made a part of these specifications as listed herein. C. The general intent of the contract, specifications, drawings, and other contract documents is that the Contractor shall: 1. Furnish tools, qualified labor, material, equipment, qualified superintendence, and services, assurances and guarantees, and assumptions of risk and responsibility, necessary for the performance of the Work as set forth in the contract documents unless otherwise specifically provided. 2. Begin work promptly and proceed expeditiously and continuously without cessation or shutdown of Work unless otherwise specifically approved in writing by the OCTA Engineer, or directed by the contract documents. 3. Perform, complete, and make ready for its intended purpose, within the times specified, including additional times provided for certain conditions, the work or parts thereof covered by the contract, all in accordance with drawings, specifications, and modifications thereto and directions or instructions the OCTA Engineer may give to supplement the drawings and specifications. The Contractor shall retain sole responsibility and expense for quality control of the work. D. Words and abbreviations which have well-known technical or trade meanings are used in the contract documents in accordance with such recognized meanings. E. The organization of the specifications into divisions, sections, parts, and paragraphs, and the arrangement of the drawings, shall not control the Contractor in dividing the work among subcontractors or in establishing the extent of work to be performed by any trade. Study and compare the contract documents and immediately report to the OCTA Engineer any error, inconsistency, or omission that may be discovered. Contractor shall be liable to OCTA for damage resulting from unreported errors, inconsistencies, or omissions in the contract documents. F. It will be the responsibility of the Contractor to stage the construction activities at the project site, using the Site Specific Work Plan process (SSWP) G. Ownership of Materials: 1. Materials furnished by the Contractor under this contract shall become the property of the OCTA. H. General Summary of Work: 1. Work to be performed by Contractor shall consist of the construction of the work shown on the drawings and detailed in the specifications. 2. The descriptions provided in this section are general in nature and are not meant to detail all work required by the contract documents. 3. The work under this contract consists of vehicular and pedestrian security gate improvements and pedestrian pathway improvements at the following locations: a. Anaheim Bus Base, 1717 E. Via Burton, Anaheim, CA 92806 b. Garden Grove Bus Base, 11790 Cardinal Circle, Garden Grove, CA 92843 c. Santa Ana Bus Base, 4301 W. MacArthur Blvd., Santa Ana, CA 92704 4. This project is a facility modification project under OCTA Level 3 Health, Safety and Environmental Specifications and requirements. I. Other features of the work include, but are not limited to, the following, as indicated in the respective Contract Drawings and Specifications for the Anaheim, Garden Grove and Santa Ana Bus Bases: 1. At the indicated vehicular entrances and exits, demolish existing electricallyoperated rolling vehicular security gates and replace with new gates. Except at Anaheim Bus Base garage, the new vehicular gates are to be hydraulicallyoperated cantilevered slide gates. At Anaheim Bus Base garage, the new vehicular gates are to be motorized overhead coiling grilles. Furnish and install embedded sensor loops, electronic access controls, and provide modifications and enhancements to video surveillance systems. Provide related modifications to existing foundations and new foundations for new support posts. 2. At Anaheim Bus Base, add two new pedestrian security gates, each with video surveillance system and electronic access controls. 3. Integrate new gate and access controls with each existing and respective Bus Base gate control and security system. 4. Integrate new/modified video surveillance systems with existing OCTA video surveillance system and platform. 5. Furnish and install new pre-engineered and prefabricated guard booths at Garden Grove and Santa Ana Bus Bases, as indicated. 6. Furnish and install new in-roadway warning light systems for pedestrian crosswalks and enhanced pathway definition as indicated at Anaheim and Santa Ana Bus Bases. 7. Cut and patch pavements, and modify curbing, parking, circulation configurations, and other site features as indicated to accommodate the new gates, pedestrian walkways, in-roadway warning lights, guard booths, and related underground electrical work. Provide new striping and other painted pavement markings as indicated. Provide construction joints with sealant and backer rod in concrete pavement. 8. Provide indicated modifications to existing masonry and concrete walls and to existing steel fence to accommodate the new gates. 9. Provide miscellaneous repairs as indicated for selective existing masonry walls. 10. Furnish and install custom steel picket fencing, protective bollards, other protective metal fabrications, and chain-link fencing as indicated. 11. Provide field painting of new bollards and other metal work that is not factory or shop painted. Paint posts for overhead coiling grilles. Do not paint galvanized posts for sliding gates. 12. Provide painted lettering as indicated. 13. Provide signage as indicated. 14. Provide related electrical work, including but not limited to power, communications, and control wiring or cabling, buried and surface-mounted conduits, handholes, boxes, disconnects and other devices, connections, panels, breakers, and identification. Provide luminaires for new pedestrian security gates. 15. Modify, improve and/or restore other existing construction affected by the work. 16. Provide related earthwork, including excavations, trenching, protections, dewatering, backfill, compaction, and testing. 17. Start-up, test, adjust, and demonstrate new operable gate systems, controls, intercoms, video surveillance equipment, guard booth equipment, and inroadway warning light systems. 18. Complete mobilization and demobilization 19. Obtaining of necessary construction and related permits from various jurisdictional agencies. Contractor shall be responsible for all related fees from various jurisdictional agencies. 20. Obtain and pay for all licenses required by all jurisdictions associated with the approval and requirements of the project. The general description of this project is Security Gates Installation at Anaheim, Garden Grove, and Santa Ana bus bases and related work. The estimated cost for this project is $2,500,000.00. All requests for approved equals, clarification of specifications, or questions must be put in writing and must be received by the Authority 1. U.S. Mail: Orange County Transportation Authority, P.O. Box 14184, Orange, California 92863-1584. 2. Courier/Overnight: Orange County Transportation Authority, 600 South Main Street, Lobby Receptionist, Orange, California 92868 3. Facsimile: (714) 560-5792. 4. E-Mail: mthreats@octa.net

Award

Transportation Terminals

$3,798,000.00

Public - County

Site Work

116

23

5

10

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
513
Active Projects
243
Bidding Soon
3,867
All Active Projects
1,760
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 27, 2023

May 26, 2023

img_map_placeholder

Multiple Locations, Anaheim, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.