Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a civil project in Blair, Nebraska. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Site Directions: Blair, Nebraska Project Category Code: Pumps or Pump stations, Demolition/Building Removal/Hauling/Salvage, Water and Wastewater Facilities Description: Select demolition activities at the existing treatment facility that include removal of existing gravity sanitary sewers and water force mains to allow for new construction, removal of existing 42-inch outfall and associated manhole at the Missouri River. Construction of a Lime Solids Equalization Basin and associated pump building, gravity bypass piping and manholes, reconnection of water force mains, installation of discharge pumps and recirculation pump system. Construction of lowered 42" outfall and associated manhole at Missouri River. Additional Description: Construction activities include providing all necessary materials, labor, equipment, and testing for the installation and/or construction of improvements to the following: 1. Select demolition activities at the existing treatment facility that include: removing two 12-inch sanitary lines, one that is abandoned and the other that is the tie-in to the equalization basin project; removal of a portion of 20-inch and 24-inch raw water force mains (one of the mains must remain in service until the other is completely replaced and put in service); removal of 42-inch outfall and associated manhole. 2. Construction Activities include providing all necessary materials, labor, equipment, and testing for the installation and/or construction of improvements to the following: a. New 56-foot diameter concrete equalization basin complete with geodesic dome cover, access platform and connecting pump building consisting of all associated piping and appurtenances for two discharge pumps and one recirculation pump. Spare backup recirculation pump to be provided. Includes mechanical, electrical, service water supply, and coordination of controls integrated into existing SCADA system. b. Removal and replacement of 42-inch RCP pipe and outfall at the Missouri River including replacement of 72-inch manhole. Outfall to be lowered and reinforced per the plans. Outfall will pass through US Army Corps of Engineers stone revetment. c. Plant SCADA system modifications and reconnections. d. Project work shall include all required spare parts as listed in the specifications. 3. SWPPP, Floodplain development, Fire Marshal, and other permitting implementation. 4. All work complete with bypass pumping of selected processes, connections to existing
Post-Bid
Water / Sewer
$365,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 29, 2023
April 29, 2023
Multiple Locations, Blair, NE
Related To This Project
Blair, NE
Bid Date: Apr 19 2023
Blair, NE
Bid Date: Mar 16 2023
Blair, NE
Bid Date: May 09 2023
Blair, NE
Bid Date: May 09 2023
Blair, NE
Bid Date: May 23 2023
Blair, NE
Bid Date: Jun 06 2023
Blair, NE
Bid Date: May 23 2023
Blair, NE
Bid Date: May 23 2023
Blair, NE
Bid Date: Mar 15 2023
Blair, NE
Bid Date: Sep 29 2022
Blair, NE
Bid Date: Aug 16 2022
Blair, NE
Bid Date: Jul 22 2021
Blair, NE
Bid Date: Apr 23 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.