BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a service station / car wash facility in Nampa, Idaho. Completed plans call for the renovation of a service station / car wash facility.

As of April 19, 2023, the project has been awarded. A timeline for construction has not been confirmed. The Board of County Commissioners reserves the right to accept or reject any or all bids and portions thereof and to waive informalities or irregularities of bids received based on any business reason it deems applicable ifthis is to the advantage ofthe County. Questions, requests for clarification, and objections relating to the IFB or the IFB process will be considered only if they are submitted in writing and received by the Clerk of the Board of County Commissioners no later than 9:00 a.m. on March 16, 2023 Questions, clarifications, and objections should be sent to Clerk of the Board of County Commissioners by U.S. Mail to 1115 Albany Street, Caldwell, Idaho 83605, or by email to BOCC@canyoncounty.id.gov. A. General: The Work included in the contract consists of construction of improvements to the landfill gas collection and control system (GCCS). The Work is more fully detailed in the Construction Drawings and Specifications included herein. B. Principal features include: 1. Mobilization and demobilization of equipment, labor, and construction of temporary facilities. 2. Installation of GCCS improvement components, which include but are not limited to the following: a. Vertical Landfill Gas Extraction Wellheads b. GCCS improvements for LFG piping, compressed and condensate lines c. GCCS improvements for Qualifications, pipe supports, anchors, and flange connections d. Gas Monitoring Probes (OPTIONAL) e. GCCS improvements for Valves 3. Installation and start-up of Gas Handling Skid, Flare Assembly, Air Compressors, and Condensate Tank. 4. Welding of HDPE pipe. 5. Trenching and backfilling both in and out of the waste footprint for gas, air, condensate piping, and electrical conduits. 6. Installation of structural and concrete components including skid anchoring, flare/equipment foundation, and condensate pump foundation. 7. Surveying work including equipment, structural components, and grading. C. The above description of the Work is for general information only and does not limit the responsibility of the CONTRACTOR to accomplish the Work in strict accordance with the Construction Drawings and Specifications. D. Environmental Observations: The Work shall be performed in strict accordance with the applicable requirements of the federal, state, and local agencies having jurisdiction, and in accordance with the requirements of the Construction Drawings, General Conditions, Supplementary Conditions, and these Specifications. E. Time of Completion: CONTRACTOR shall complete construction work December 31, 2023. If the work is not completed within the time stipulated, the COUNTY shall be entitled to claim liquidated damages at a fixed sum of $500 for each and every calendar day the completion of work under the contract is delayed. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Service Station / Car Wash

$2,614,806.00

Public - County

Renovation

66

16

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
17
Bidding Soon
334
All Active Projects
123
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 6, 2023

May 29, 2023

December 31, 2023

img_map_placeholder

15500 Missouri Ave, Nampa, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.