Published April 15, 2025 at 8:00 PM
Updated April 16, 2025
Site work for a water / sewer project in Brentwood, New Hampshire. Conceptual plans call for site work for a water / sewer project.
Update:The waterline along Jacob Burner Road was installed in the 1960's as part of the McGaheysville Water System and includes a mix of a short section of 6-inch asbestos concrete pipe and the remaining section as 2-inch PVC pipe. The line needs to be replaced due to its age and at the same time upgraded to an 8-inch line to accommodate future growth in this area. The approximate length is 5,600 linear feet and would allow for the installation of fire hydrants which are not currently along this section of roadway due to the 2-inch line size. Project is included in Rockingham County Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update: https://www.rockinghamcountyva.gov/DocumentCenter/View/19139/CIP-FY25-29 The waterline along Jacob Burner Road was installed in the 1960's as part of the McGaheysville Water System and includes a mix of a short section of 6-inch asbestos concrete pipe and the remaining section as 2-inch PVC pipe. The line needs to be replaced due to its age and at the same time upgraded to an 8-inch line to accommodate future growth in this area. The approximate length is 5,600 linear feet and would allow for the installation of fire hydrants which are not currently along this section of roadway due to the 2-inch line size. Project is included Rockingham County Fiscal Year 2025-2029 Page No 14 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The waterline along Jacob Burner Road was installed in the 1960's as part of the McGaheysville Water System and includes a mix of a short section of 6-inch asbestos concrete pipe and the remaining section as 2-inch PVC pipe. The line needs to be replaced due to its age and at the same time upgraded to an 8-inch line to accommodate future growth in this area. The approximate length is 5,600 linear feet and would allow for the installation of fire hydrants which are not currently along this section of roadway due to the 2-inch line size. This project is in included in the City's or County's FY 2023-2027 Capital Improvement Plan (CIP). As of February 27, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$625,000.00
Public - County
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2025
Jacob Burner Road, Brentwood, NH
Related To This Project
Brentwood, NH
Bid Date: Apr 10 2023
Brentwood, NH
Bid Date: May 22 2023
Brentwood, NH
--
Brentwood, NH
Bid Date: Jul 03 2023
Brentwood, NH
Bid Date: Jul 31 2023
Brentwood, NH
Bid Date: Jul 17 2023
Brentwood, NH
Bid Date: Aug 07 2023
Brentwood, NH
Bid Date: Aug 14 2023
Brentwood, NH
Bid Date: Mar 06 2023
Brentwood, NH
Bid Date: Jun 05 2023
Brentwood, NH
Bid Date: Mar 20 2023
Brentwood, NH
Bid Date: Feb 13 2023
Brentwood, NH
Bid Date: Feb 13 2023
Brentwood, NH
Bid Date: Sep 26 2022
Brentwood, NH
Bid Date: May 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.