EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 13, 2023 at 8:00 PM

Updated December 20, 2024

Site work and paving for a civil project in Arcadia, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Counties: Desoto Road Name: SR 70 Limits: From the Manatee Co Line to Cr 661 Project(s): 44547315201(*) Federal Aid No: D123006B Project(s): 44547315202 Federal Aid No: D123006B Total Roadway Length: 11.133 Miles Contract Days: 300 Total Bridge Length: 0.153 Miles Total Proposal Length: 11.286 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days (Aqui Time) The improvements under this contract consist of milling and resurfacing, base work, shoulder treatment, drainage improvements, highway signing, guardrail, geosynthetic reinforcement, and other incidental construction on SR 70 from the Manatee County Line to CR 661 in DeSoto County. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 005 Resurfacing

Award

Roads / Highways

$11,238,774.00

Public - State/Provincial

Paving, Site Work

242

5

2

9

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
56
Bidding Soon
1,102
All Active Projects
466
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

April 7, 2023

img_map_placeholder

FL-70, Arcadia, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.