Published May 8, 2023 at 8:00 PM
Updated January 26, 2024
Renovation of a detention facility in Fort Worth, Texas. Completed plans call for the renovation of a detention facility.
The deadline for receipt of all questions is 12:00 p.m., CST, Wednesday, March 15, 2023. After this deadline, all questions and responses will be posted on the website and available for download by interested parties. All questions must be submitted in writing and directed to Elizabeth Pietzsch, CPCM, Senior Contracts Administrator, via fax at 817-884-2629 or, if unable to fax, email to BidQuestions-RSVP@tarrantcounty.com. The email must include the RFB No. in its subject and confirmation of receipt by Tarrant County is required. The Mechanical Contractor for this project will be the Prime Contractor and will be responsible for ALL work on the project. The Mechanical Vendor will need to acquire ALL required subcontractors that are needed to complete all elements of the work. This will include, but not be limited to: Electrical work, Piping work and General Construction work. This will NOT include Controls work. 2. This contract to replace the Air Handling Unit equipment will be performed concurrently with a separate contract to replace the existing Building Automation System. The work for this contract will need to be performed in close coordination with the Building Automation System Contractor so that it will be installed as if one seamless project. 3. The Contractor for the Building Automation System replacement project will furnish certain control devices to this Contractor who will install them. This will include chilled water and heating water control valves and automatic control dampers and fire/smoke dampers. 4. This Contractor shall be responsible for developing a plan for removal of all demolished equipment from the building and delivery of all new equipment into the building via exterior louvers and/or freight elevator. Provide all cranes, rigging, etc, as required. Tarrant County Facilities Management and the City of Fort Worth will need to approve any street closures, etc. 5. The equipment replacement work, and related Building Automation System replacement work (performed under separate contract) will be performed on a Quadrant-by-Quadrant basis. When one Quadrant is down for replacement, all functions on the remaining 3 Quadrants must remain fully functional. 6. The First, Second, Third Floors and portion of the Fifth Floor will remain occupied during the duration of the project and will need to have Heating and Air Conditioning maintained at all times. Provisions for using temporary ductwork from other units while these units are replaced is indicated on the drawings
Award
Jails / Prisons
$9,941,493.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 30, 2023
May 1, 2023

100 N Lamar St, Fort Worth, TX
Related To This Project
Fort Worth, TX
Bid Date: Mar 16 2023
Fort Worth, TX
Bid Date: May 09 2023
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Mar 30 2023
Fort Worth, TX
Bid Date: Mar 30 2023
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Mar 09 2023
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Jul 18 2023
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Mar 16 2023
Fort Worth, TX
Bid Date: Feb 27 2023
Fort Worth, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.