BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Roundup, Montana. Contact the soliciting agency for additional information.

AVIATION PLANNING SERVICES or ARCHITECTURAL/ENGINEERING SERVICES FOR AIRPORT DEVELOPMENT PROJECTS for Musselshell County/Roundup City Airport. Services are outlined in FAA Advisory Circular 150/5100-14E, Change 1, SECTION 1.4.1 (PLANNING) or SECTION 1.4.2 (DEVELOPMENT) for the following project(s): Design and construct a terminal and hanger. Electrical work and designs as needed. Other planning survey or design projects as needed by the Roundup Municipal Airport. THE SERVICES ARE LIMITED TO THOSE SPECIFIC PROJECTS THAT THE SPONSOR REASONABLY EXPECTS TO INITIATE WITHIN 5 YEARS OF THE EFFECTIVE DATE OF THE INITIAL CONTRACT. The work may be accomplished during the course of multiple grants. All parties are advised that some of the services may not be required and that the Sponsor reserves the right to initiate additional procurement action for any of the services included in the initial procurement. If more than one party is selected, the expected projects to be performed by each party will be defined, together with the statement of work and the required services, at the time of the procurement action. The Sponsor will provide notification to each firm of the projects they are being awarded. The method of Contractor Selection has not been Determined at this time

Conceptual

Transportation Terminals

$418,000.00

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
26
All Active Projects
10
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2023

img_map_placeholder

60 Airport Rd, Roundup, MT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.