BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 26, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Buena Park, California. Completed plans call for site work for a water / sewer project.

The Project includes, without limitation, furnishing all necessary labour, materials, equipment and other incidental and appurtenant work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents ("Work"). This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the Engineer. Each prospective bidder ("Bidders") is responsible for fully acquainting themselves with the conditions of the scope of work as it relates to doing work in the City. Mandatory pre-bid complete job-walk is required for all potential bidders. Please call and coordinate with frank moore (sewer services supervisor), cell: (714) 334-6061 to schedule a pre-bid complete job-walk between dates. Each Bid must be accompanied by a cash deposit, cashier's check, certified check or Bidder Bond issued by a Surety insurer, made payable to the City and in an amount not less than ten percent (10%) of the total Bid price submitted. Each Bidder shall possess a valid Class A Contractor's license issued by the California State Contractors License Board, at the time of the Bid submission. Mobilization, demobilization, construction of a UV-cured Glass Reinforced Plastic Cured-InPlace (GRP-CIPP) Liner per the specifications, trimming of the liner, pre-and-post CCTV inspection of each line, removal and proper disposal of existing debris, cleaning of the lines using high pressure jetting, pressure grouting as needed prior to lining, trench excavation and backfill, pavement restoration, traffic striping replacement, and all other items to complete the work in place.

Award

Water / Sewer

$169,600.00

Public - City

Site Work

4

7

7

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
629
Active Projects
266
Bidding Soon
3,587
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2023

April 17, 2023

Project location map

Stanton Ave, Buena Park, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.