BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 13, 2023 at 8:00 PM

Updated October 31, 2024

Site work for a road / highway in Cocoa, Florida. Completed plans call for site work for a road / highway.

Counties: Dist/st-wide Road Name: I-95 Limits: From Mm 274 to Mm 294 VOLUSIA AND FLAGLER COUNTY (73001000 & 79002000) [FT MYERS Letting: CT230329 Project(s): 44976515201(*) Federal Aid No: D523006B Total Roadway Length: 19.750 Miles Contract Days: 150 Total Bridge Length: 0.000 Miles Total Proposal Length: 19.750 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Calendar Days The improvements under this contract consist of deployment of Intelligent Transportation System (ITS) Advanced Incident (Queue and Stopped Vehicle) Warning System along I-95. The deployment seeks to provide early detection of traffic incidents, such as stopped vehicles or queuing, and transmit/display advanced warning messages on roadside LED embedded warning signs approaching the incident. The goal is to provide ample notification to roadway users of unsafe traffic conditions ahead so that users can take precautionary measures to attempt to reduce secondary crashes. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. FDOT - Call Order: 019 - ITS Communication System Fl20230153 All Highway Work Under This Contract - Flagler Co Fl20230191 All Highway Work Under This Contract - Volusia Co

Award

Roads / Highways

$527,418.00

Public - State/Provincial

Site Work

5

13

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
134
Bidding Soon
1,729
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

April 28, 2023

Project location map

I-95, Cocoa, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.