BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 23, 2024 at 8:00 PM

Updated August 24, 2024

Site work and paving for a road / highway in Bend, Oregon. Design plans call for site work for a road / highway; and for paving for a road / highway.

Constructing a single-lane roundabout • Installing illumination • Installing new Signs, Striping and Delineation • Clearing roadside obstructions As of August 23, 2024, per owner, this project has been bundled with the South Century Drive / Huntington Road Roundabout, and South Century Drive / Venture Lane Intersection Improvement projects for design. The design contract was awarded, and design was initiated in early August 2024. Construction of these projects will be delivered using a phased approach, with the South Century Drive / Huntington Road Roundabout scheduled for construction June 2026 – December 2026

Design

Roads / Highways

$2,854,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
6
Bidding Soon
116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

Sisemore Rd, Bend, OR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.