BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Paragould, Arkansas. Completed plans call for site work for a transportation facility.

Some significant work items are: L-849 REIL: 1 L.S. A proposal guaranty shall accompany each bid. The guaranty shall be either a bid bond (executed on the form furnished by the Owner), cashier's check, certified check, or other negotiable instrument equivalent to (5) percent of the amount of the bid, as assurance that the bidder will, upon acceptance of his/her bid, execute the Contract and cause to be executed a Performance Bond and Payment Bond, acceptable to the Owner, within 10 calendar days following notice of contract award. Such proposal guaranty shall be made payable to the City of Paragould. It is the policy of the City of Paragould that disadvantaged business enterprises, as defined in 49 CFR Part 23, shall have the maximum opportunity to participate in the performance of contracts. The proposed contract is under and subject to Executive Order 11246 of September 24, 1965, and to the Equal Opportunity Clause. The Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth in the Specifications. The Bidder must supply all the information required by the proposal form. The successful bidder will be required to submit a Certification of Nonsegregated Facilities prior to award of the contract, and to notify prospective subcontractors of the requirement for such a Certification, where the amount of the subcontract exceeds $10,000. Samples of the Certification and Notice to Subcontractors appear in the Specifications. Women will be afforded equal opportunity in all areas of employment. However, the employment of women shall not diminish the standards or requirements for the employment of minorities. Act 150 of 1965, Arkansas Statutes, states that a contractor must be licensed by the State Licensing Board of Contractors, or have an application for license on file with the Licensing Board, before he may submit a bid for work when the cost thereof is Twenty Thousand Dollars ($20,000.00) or more. The City of Paragould reserves the right to reject any or all bids and to waive formalities, except for conditions affecting Executive Order 11246. As a means of providing a secure and fair bid, No Plans, Specifications, or information will be provided to any "Plan Rooms".

Post-Bid

Transportation Terminals

$300,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
19
Bidding Soon
366
All Active Projects
126
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2023

April 10, 2023

img_map_placeholder

To Be Determined, Paragould, AR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.