BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 20, 2023 at 8:00 PM

Updated August 28, 2025

Site work for a water / sewer project in Shirley Ctr, Massachusetts. Completed plans call for site work for a water / sewer project.

The Shirley Water District (Owner) is requesting ads for the construction of the following Project: Hatch Tank and Heyliger Tank Rehabilitation The Project includes the following Work: For two steel elevated water storage tanks, work consists of abrasive blasting and application of new coating system of the Interior and exterior bowls, power tool cleaning and over-coating the exterior fluted pedestals, and power tool cleaning and spot coating of the dry Interior pedestals A pre-bid conference is not required. For all further requirements regarding funding agency notifications, funding agency requirements bid submittal, qualifications, procedures. and contract award, refer to the Instructions to Bidders that we included in the Bidding Documents The bidding and award of this Contract will be under the provisions of M.G.L Chapter 30. Section 39M. Complete instructions for filing Ms are included in the Instructions to Bidders. Bich General Bid and Sibbid shall be submitted In accordance with the instruct ions to Bidders and Stall be accompanied by a Bid Security In the amount of 5 percent of the Bid. No Bidder may withdraw their Bid for a period of thirty (30) days. excluding Saturdays Sundays, and legal holidays alter the actual date of the opening of the General Bids. This advertisement does not obligate the Owner for any costs assodat ed with preparing or submitting bids. The successful General Bidder must furnish a 100 percent Performance Bond and a 100 percent Payment Bond with a surety company acceptable to the Owner. Minimum wage rates as determined by the Executive Ctfice of Labor and Workforce Development, Department of Labor Bandards (Dia under the provisions of m.G.L., Chapter t49, Section 26 to 2713, as amended, apply to this project. It is t he responsibility of the contractor, before bid opening, to request if necessary, any additional information on Prevailing Wage Ftstes for those tradespeople who may be employed for the proposed work under this contract. The Owner reserves the right to waive any iMormality in or to reject any or all Bids if deemed to be in its best interest.

Award

Water / Sewer

$1,866,500.00

Public - City

Site Work

21

13

5

7

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
672
Active Projects
351
Bidding Soon
4,737
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

June 1, 2023

Project location map

Multiple Locations, Shirley Ctr, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.