BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Wilson, North Carolina. Working plans call for the renovation of a educational facility; for site work for a educational facility; for paving for a educational facility; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; water / sewer project; and water / sewer project.

As of September 24, 2024, construction documents are underway for this project. Information regarding a general contractor has not been disclosed. A timeline of construction has not been reached at this time. *The closed solicitation has been included below for reference: (1) Campus Drainage / Critical Facility Repairs: The project consists of grading, paving, and storm water improvements. Heavy rains create runoff that overwhelms the current storm drainage system along the roadway west of Vestal Hall. The campus workshop is located in space on the lower level of Vestal Hall. The floor elevation of the workshop is approximately 2-3 feet below the road elevation. School staff reports recurring events of flooding inside of the shop space and service court area where drainage is inadequate to handle the water volume. Impacts of the flooding include equipment damage, hazard to occupants during events, and threatens the long-term integrity of the building. Work also includes kitchen dock repairs, Woodard egress repairs, and correction of Vestal building settlement issues. (2) Vestal Hall Roof Replacement: Age and condition of the roof make replacement necessary. General deterioration and leaks at flashing points are common. A second roof coating has been previously added such that no additional roofing can be added without complete tear-off of the existing roof system. The work will include removal of the existing roof systems down to the structural deck. The proposed membrane roof system will remove upgrade the roof insulation to include tapered roof systems with higher performing insulation materials. (3) Williamson Gym HVAC Upgrades The project consists of HVAC improvements purposed to improve air quality and comfort for gymnasium occupants. Currently the gymnasium is heat and ventilation only. The existing steam radiator system will be demolished. These upgrades will utilize energy efficient equipment and allow for outside air use during all operating seasons. This Campus Repairs & Renovations project located at the Eastern NC School for the Deaf in Wilson, NC consists of multiple scopes of work that have been combined into a single project to be performed under one design contract and will include the following repairs and renovations on campus. Total Project Budget $5,266,000 Total. No paper copies are required to be submitted.

Final Planning

Educational

$5,000,000.00

Public - State/Provincial

Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
81
Bidding Soon
1,588
All Active Projects
627
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 17, 2025

img_map_placeholder

1311 U.S. Hwy 301 N, Wilson, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.