BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 3, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Garden Grove, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of May 3, 2023, project was awarded to PCI, awarded amount is $1,272,467.55.** This project consists of bicycle signing and striping improvements at Brookhurst Avenue (From Trask Avenue to Katella Avenue), West Street (From Garden Grove Boulevard to Orangewood Avenue), Chapman Avenue (From Valley View Street To Beach Boulevard), Gilbert Street (From Deodora Drive to Katella Avenue), and Lampson Avenue (From Dale Street to Haster Street). The Contractor will be required submit one (1) set of federal forms for the project. The Contractor will be required to pay the latest prevailing wage rates per the Davis-Bacon Prevailing Wage Regulations as established by the State of California, Department of Industrial Relations. Certified weekly payroll reports, monthly utilization and Davis-Bacon Regulation reports for the prime and all subcontractors will be required for each project. Additionally, this Contract requires that the Contractor submit a fully completed "Bidder DBE Information" forms with bid package, and other items not mentioned above that are required by the plans and specifications. The DBE goal for this project is 12%. The project shall comply with all federal requirements including Buy America (updated from Build America Buy America Act) The Contractor is advised that the entire project is a combination of five (5) sets of plans for one (1) Project. One (1) "Notice to Proceed" will be issued for the entire project. The entire project shall be completed within forty-five (45) working days. License Requirements A and/or C32 Bidder's RFIs Due: Feb 24, 2023 - 5:00 PM PST Response to RFIs Due: March 3, 2023 - 5:00 PM PST DBE Goal: 12%.

Award

Roads / Highways

$1,272,468.00

Public - City

Paving, Site Work

24

8

2

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
631
Active Projects
305
Bidding Soon
4,164
All Active Projects
1,845
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2023

April 3, 2023

Project location map

Multiple Locations, Garden Grove, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.