BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a playground / park / athletic field in Covington, Georgia. Working plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

The owner has determined a prequalified list of design build companies. Questions Due Date: Mar 17th 2023, 12:00 PM EDT PROJECT DESCRIPTION: Newton County ("Owner") is embarking on renovations of their Parks & Recreation Facilities such as: 1. City Pond Park - Athletic Lighting Retrofit The following is provided to assist the Design-Build firms or teamsin determining if they have the necessary project experience to submit a proposal and be considered for these projects. SCOPE: GENERAL SCOPE OF SERVICES. Includes complete CM Pre-Construction services; Cost management; Schedule management; submissions and permitting to all Authorities Having Jurisdiction, including, but not limited to, City of Covington Development Services and Fire Marshall (if necessary); full Construction Management, Design-Build and Post Construction services. (Refer to Attachment A - General Scope of Work for details) Pre-Construction Phase: (Facility Assessment / Design Services). Design Builder and their team of Engineers and/or Sub Contractors will complete Facility Assessments of the existing City Pond Park Athletic Lighting to determine all necessary improvements to retrofit and change out to new Athletic LED Lighting systems. Goal is to achieve a better understanding of what improvements will be necessary to support the scope of work. From this effort, the Design Builder will prepare Designs and Engineering and Guaranteed Maximum Prices that will be evaluated against budgets to determine specific scope to be achieved. This will include a complete Scope of work to expand and renovate the previously listed facilities. (Refer to Attachment B - Specific Scope of Work for details) Construction Phase: Design Builder and their team will procure and install all required work associated with the approved GMP. Work will be accomplished while building isstill in operation so sequencing of work will need to take this into consideration. (Refer to Attachment B - Specific Scope of Work for details) It is the objective of Newton County to have their projects completed for as low a cost as practical without sacrificing the Owner's requirements, Design Standards, and/or Long-term Op

Final Planning

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - County

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
92
Bidding Soon
1,515
All Active Projects
657
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2023

July 3, 2023

img_map_placeholder

13501 City Pond Rd, Covington, GA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.