BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in La Baie, Quebec. Completed plans call for the renovation of a medical facility.

Reference number : 1696307 Deadline for receipt of complaints: 2023-03-10 Submission sent electronically accepted: Yes, in a single submission document Expected duration of the contract without the options (in months): 4 The work in this section relates to the electrical works to be carried out. In parallel with this document, the contractor must refer to all the electrical plans in order to fully understand all of his works. The contractor shall supply labour, apparatus, cables, electrical conductors and conduits, documentation, equipment, machinery, scaffolding, supports, services, test apparatus, materials and all accessories necessary for the manufacture, supply, delivery, storage, installation, connections, testing, start-up and warranty of equipment and materials, for the works described in this section . The conductors of each power supply must be of the required gauge and section required for a voltage drop of less than 3% in steady state between the corresponding transformer and all the devices supplied by this transformer. The works described below are not exhaustive. These works are defined more specifically in the documents and drawings. It is understood that all devices or accessories necessary for a complete installation must be supplied and installed, even if they are not specifically described. The drawings and specifications are complementary. Any installation or equipment shown on the drawings, even if it is not specifically specified in the specifications, or vice versa, is part of the tender documents as if it were specified and shown in the specifications. The contractor must examine the contract documents, the work site and inquire in detail about all the conditions and limitations. The estimate and the plans must be carefully studied. Under no circumstances will it be permitted to carry out work under voltage for the entire mandate. All additional work not specifically indicated on the plans is necessary to complete the work described in the plans and specifications. The engineer may change the exact location of electrical services or equipment on site by 3050 mm, at no additional cost. A monorail with a capacity of 2000 lbs is available at the back of the mechanical room. The contractor may use this monorail for handling demolished equipment and new equipment to enter the building. That said, vehicular access is restricted. The contractor will be responsible for all work relating to the electricity package covering the electrical work as indicated, that is to say each of the sections of the specifications. He will have to subcontract the specialized sections himself. The Contractor shall perform its Work in accordance with all requirements of the Contract Documents and shall examine the site of the Work and inquire in detail about all existing conditions and limitations. The contractor is supposed to know the difficulties and requirements of the work to be performed; thus, under no circumstances will any claim be accepted from him if, through negligence, he does not comply with the conditions requested. The contractor must check all the plans of each of the disciplines that are part of this project in order to fully understand all the connections for which he is responsible. If one or more electrical devices become defective as a result of incorrect connections, the electrical contractor will be held jointly responsible with the contractor who provided the equipment in question. The contractor shall operate the connected equipment in the presence of the contractor who supplied this equipment in order to prevent any defect. In the event of discrepancies or contradictions in the engineering plans and specifications, the engineer reserves the right to apply the most restrictive solution. The bidding contractor noting these discrepancies should issue a question as an addendum in order to clarify the exact need. Teck90 or ACWU cables must be fitted with a StarTeck type connector (or StarTeck ST depending on the type of cable). Clamping collars will be refused as a connector. The contractor must provide his own external sanitary facilities. It will not be permitted to use those of the CIUSSS. The contractor must comply at all times with the lockout procedures of the CIUSSS attached in the tender document. COVID procedures are currently maintained in hospitals (controlled access to the entrance to the establishment, mandatory hand disinfection, wearing a mask at all times in the hospital). Provide for compliance with these. An update of the procedures will be done by the infection prevention team at the start of construction.

Award

Medical

$241,500.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
13
Bidding Soon
247
All Active Projects
96
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 24, 2023

April 26, 2023

August 24, 2023

img_map_placeholder

1000 Rue du Dr Desgagné, La Baie, QC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.