BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Fort McCoy, Wisconsin. Completed plans call for the renovation of a military facility.

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of replacing the facility's three aging hot water boilers with three new 4000 MBH high efficiency hot water boilers, replace the hot water supply and return piping within the mechanical room, replace the existing hot water distribution pumps with new, and provide an updated DDC system for the new boiler controls. Provide a 100kW combined heat and power system that will generate power for the facility while creating hot water that will be tied into the building hot water system. Provide electrical modifications as needed for boiler plant and combined heat and power system. Provide minimal site modifications for combined heat and power system. Base Bids will be received as a single lump sum bid for: 3) Plumbing; 4) Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Bid-Results:- 1. PLUMBING WORK - Hooper Corporation-$ 24,727 2. MECHANICAL WORK - Wisconsin Mechanical Solutions, LLC- $ 881,645 3. ELECTRICAL WORK -Poellinger Electric, Inc- $383,733.

Award

Military

$67,000.00

Public - State/Provincial

Renovation

23

15

10

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
8
Bidding Soon
363
All Active Projects
160
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2023

May 5, 2023

img_map_placeholder

90 S 10th Ave, Fort McCoy, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.