EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 25, 2025 at 8:00 PM

Updated March 26, 2025

Site work and new construction of a transportation facility in Lawrenceville, Georgia. Design plans call for the construction of a transportation facility.

The County kicked off the planning effort for the project in 2018 when the Connect Gwinnett -Transit plan recommended a replacement of the existing Gwinnett Place Transit Center with a modern facility built to accommodate major, county-wide expansion of transit service. It will serve as a key part of the county’s effort to redevelop Gwinnett Place Mall into a regionally significant transit-oriented development. The new transit facility will be constructed to maximize energy efficiency and accommodate electric bus charging and other future technologies. Once completed, it will provide modern amenities to riders, access to a future BRT, and integrated multi-modal connections to bicycle, pedestrian and trail, and rider sharing infrastructure. Based on these planning efforts, three phases were proposed: 1) Phase 1- Gwinnett Place Transit Center • A two-story transit center building will house on-site customer service, public restrooms, and operator restrooms and break area. The attached mobility building will offer travel training, serve disabled riders seeking mobility assistance and to qualify for paratransit service. • Expanded bus bays from five to 12 bays including two for articulated buses with amenities, including overhead canopies, real-time displays, and seating. Designated bus bays will accommodate electric vehicle charging to align with the County’s first ever zero-emission fleet transition plan, currently underway in collaboration with the Atlanta Transit Link Authority (ATL). • Enhanced first-mile/last-mile connectivity including new sidewalks and a 12-foot-wide multi-use trail through the site that will link to the regional greenway corridor planned by the County. The transit center will also include a Kiss N Ride facility and EV charging stations located in the new park and ride facility. 2) Phase 2- BRT Station at Gwinnett Place 3) Phase 3- County Office and Conference Center This project has received $20 million in funding. As of March 25, 2025, an architect has been selected. The owner states that the selection of a general contracting firm will take place closer to the final design phase.

Design

Transportation Terminals

$31,250,000.00

Public - County

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
75
Bidding Soon
1,586
All Active Projects
655
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

img_map_placeholder

To Be Determined, Lawrenceville, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.