Site work, paving and renovation of a civil project in Southwest Harbor, Maine. Completed plans call for the renovation of a road / highway; for site work for a road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.
For Wastewater Treatment Facility Upgrade The Project includes the following Work: Work under this project includes, but is not limited to, all labor, materials, equipment, and incidentals for the complete upgrade of the Southwest Harbor Wastewater Treatment Plant including general conditions and mobilization, temporary construction facilities, demolition and site clearing, excavation, ledge removal, earthwork, erosion control, rock anchors, pavement, utilities including water, sewer and drainage, chain link fences, precast concrete structures, hatches, wet wells, site restoration, cast-in-place concrete, concrete rehabilitation and repair, masonry, all wood framed structures, structural steel, metal, gratings, railings, bollards, rough and finish carpentry, dampproofing and insulation, roofing and siding, steel and fiberglass doors and hardware, windows, suspended ceilings, tile floors, painting, building fixtures, and all equipment including mixers, sump pump, suction lift, influent centrifugal and metering pumps, grit removal system, blowers and diffusers, alkalinity and chemical systems, flow meters, hoists, slide and sluice gates, valves, Sequencing Batch Reactor (SBR), expansion joints, process piping, SCADA, plumbing, HVAC, electrical, and ventilation system, conduit, cables, alarms, asbestos floor tile removal, lead paint removal, and all materials for a complete working system and plant upgrade. Alternate Bid No. 1 includes the full replacement of the laboratory cabinets, counters, and fixtures. Alternate Bid No. 2 provides a credit from the Base Bid for the deletion of the exterior chlorine contact tank and the construction of a smaller Chemical Building that will contain only the alkalinity system. Alternate Bid No. 3 provides a credit from the Base Bid for the deletion of the proposed Vortex grit removal system including all accessories and appurtenances. Bids are requested for the following Contract: Wastewater Treatment Facility Upgrade Project has an expected duration of 730 days. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A-Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimis, Minor Components, Pig iron and direct reduced iron, This project will require compliance with the Federal Build America, Buy America Act (BABA). Bid Bond "A bid must be accompanied by Bid security made payable to Owner in an amount of 5% of Bidder's maximum bid price and in the form of a certified check or Bid bond issued by surety meeting the requirements of the General Conditions." Agency Not a Party "This contract is expected to be funded in whole or in part by the State of Maine Department of Environmental Protection (DEP) Clean Water State Revolving Loan Fund (CWSRF) program and the Rural Utilities Services (RUS) of USDA. Neither the State of Maine nor United States government nor any of its departments, agencies, or employees is or will be a party to this contract." SRF Disadvantaged Business Enterprises Program "The contractor must comply with the Disadvantaged Business Enterprises (DBE) requirements contained in the CWSRF Supplementary Conditions." Federal Requirements "The contractor must comply with all Federal Requirements per the CWSRF Supplementary Conditions." Davis-Bacon and Related Acts "The contractor must comply with the Davis-Bacon Related Act per the CWSRF Supplementary Conditions. All laborers and mechanics employed by the contractor and subcontractors on this project shall not be paid less than the prevailing wage rates contained in the wage determination published in the bidding documents. Wastewater Treatment Facility Upgrade OA1438 Obtaining the Bidding Documents The Issuing Office for the Bidding Documents is: Olver Associates Inc. 290 Main Street P. O. Box 679 Winterport, Maine 04496 Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8:00 A.M.- 5:00 P.M., and may obtain copies of the Bidding Documents from the Issuing Office as described below.
Bid Results
Water / Sewer
$24,268,910.00
Public - City
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 28, 2023
July 28, 2023
Apple Ln, Southwest Harbor, ME
Related To This Project
Southwest Harbor, ME
Bid Date: Nov 21 2024
Southwest Harbor, ME
Bid Date: Jul 22 2022
Southwest Harbor, ME
Bid Date: Jun 10 2022
Southwest Harbor, ME
Bid Date: Nov 15 2022
Hope, ME
Bid Date: Apr 14 2023
Northport, ME
Bid Date: Mar 10 2023
Hartford, ME
Bid Date: Apr 15 2023
Northport, ME
Bid Date: Mar 10 2023
Portland, ME
Bid Date: Mar 28 2023
Falmouth, ME
--
Lewiston, ME
Bid Date: Mar 21 2023
Lewiston, ME
Bid Date: Mar 21 2023
Farmington, ME
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.