BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Spanish Fork, Utah. Completed plans call for site work for a bridge / tunnel.

Question Submission Close Date: 3/15/2023 4:00 PM EST The purpose of this IFB is to enter into a contract with the lowest responsive and responsible bidder to provide: services for removal of old culvert and installation of new culvert. (Required services must be performed according to Attachment B: Scope of Work.) This contract will result in one contract award to the lowest cost responsive and responsible bidder Bidder will complete the work and invoice for the Culvert Project by or before June 30, 2023 Culvert Project o Old culvert which is currently below the confluence with Basin Creek will be removed o New culvert will be placed upstream on South Fork Junction Creek above the confluence of Basin creek New position of culvert will allow for a much smaller diameter product as significantly less water will need to pass through the culvert o The new culvert structure will be manufactured or purchased as an Aluminum Structural Plate PipeArch that meets the engineer's specifications. o The new Culvert will be placed as specified by the engineer's site plans. o New road will be graded from the main road (Valley Lynn Road) to the opposite side of newly placed culvert per the engineer's site plan his scope of work is for the removal of one culvert and the structure will be replaced in a manner that allows for up and downstream fish passage. The design and site plan have been engineered by Quadrant Consulting Incorporated who will retain engineering construction oversite. A site visit with DWR personnel, engineers, and landowner will be necessary prior to bidding on the project to ensure the contractor understands the job requirements, topography of the area, and location of the site. The culvert project will be required to be completed and billed for by the end of the State Fiscal Year 2023 which ends on June 30, 2023.

Award

Bridges / Tunnels

$125,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
30
Bidding Soon
474
All Active Projects
186
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2023

April 18, 2023

img_map_placeholder

Multiple Locations, Spanish Fork, UT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.