Demolition, site work and new construction of a civil project in Marco Island, Florida. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

As of February 2, 2024, the project has been awarded, notice to proceed has been issued and construction is slated to commence April 15, 2024, and be completed by May, 2025. The City of Marco Island is soliciting bids to construct a new high service pump station (HSPS) and flow meter pad at the South Water Treatment Plant located at 415 Lily Court, Marco Island, FL 34145. The scope of work includes but not limited to: 1. Demolition of the existing West HSPS and flow meter vault including associated equipment, pipes and other appurtenances. a. Demolish the whole structure of the existing building and the associated equipment and pipes. b. Demolish the flow metering vault. c. Demolish the existing West HSPS suction and discharge pipes. 2. Soil stabilization of the site for the new West HSPS. 3. New West HSPS and pipework: a. Construction of a CME block building, sub-divided into a pump room and an electrical room. b. Installation of two vertical turbine pumps and one additional pump can, compete with motors, and all associated piping, fittings, valves, and instrumentation in the pump room. Both pumps will be operated on variable frequency drives (VFDs). Provision will be made for a future fourth pump as indicated on the drawings, including the installation of its suction piping and pump can. c. Installation of all electrical switchgear, MCCs, panels, VFDs, and other equipment in the electrical room. Installation of air conditioning in the electrical room. d. Construction of the associated suction and discharge pipes, valves, and appurtenances. 4. New flow meter pad. 5. All associated electrical, instrument and control, fire protection, civil and geotechnical works. Bid Bond 5% Plan (blueprint) Electronic plan documents eBidding No *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Water / Sewer

$4,698,000.00

Public - City

Demolition, New Construction, Site Work

63

32

12

8

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
20
Bidding Soon
257
All Active Projects
103
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2023

April 15, 2024

img_map_placeholder

415 Lily Ct, Marco Island, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.