Published March 15, 2023 at 8:00 PM

Updated January 29, 2024

Site work and asbestos abatement for a medical facility in Catonsville, Maryland. Completed plans call for site work for a medical facility; and for asbestos abatement for a medical facility.

Small procurement solicitation (IFB) for Asbestos Removal and Abatement for Spring Grove Hospital C enter Administrative Building. Small Business Reserve Designation Yes 1. The Contractor is strongly urged to visit the site and familiarize themselves with the conditions under which the work will be performed. No allowance will be made for any errors on the Contractor's part for failure to take into account any conditions or circumstances existing on the site which may affect the contemplated work. All measurement are estimates and the contractor is responsible for taking their own. The fact that a bid is submitted will be taken as evidence that the Contractor has a full knowledge of the extent and character of the work and the problems in performing it. 2. Contractor shall clean up and properly dispose of any construction-related debris daily and at the completion of this project. 3. Contractor shall perform all necessary prep, including but not limited to, cleaning surfaces. 4. Contractor to supply all of the materials necessary to complete the work as described in the documents. 5. All materials are to be used for their intended purpose and per the manufacturer's guidelines. 6. Contractor is responsible to ensure weather conditions are suitable for all applications per the manufacturer's guidelines. 7. Contractor shall clean-up all overspray, spills, and splatters from all surfaces. 8. Any damage to work already in place shall be repaired to original condition at the Contractor's expense. 9. The Contractor shall notify the inspector of any situation that may develop which prevents the proper performance of the work as specified before proceeding. All work shall be accomplished within one-hundred twenty (90) calendar days from the date designated by the notice to proceed (to be reviewed). The facility will provide a water source. Contractor shall ensure all piping connections satisfy both code and industry practices and remove any temporary plumbing lines after project completion. Shower water shall be filtered to a drain approved by the facility. Location - Located Administration building - Ground Floor, First Floor And Stairs associated with the Floors, Located throughout the affected area

Post-Bid

Medical

$50,000.00

Public - State/Provincial

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
222
Bidding Soon
3,537
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2023

April 6, 2023

Project location map

55 Wade Ave, Catonsville, MD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.