BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a mixed-use development in Floresville, Texas. Completed plans call for the construction of a 24,000-square-foot, two-story above grade fire / police facility; and for site work for a fire / police facility.

This project consists of the construction of the Sapphire Bay Public Safety Facility Station No. 5. It is a two-story, combined Police and Fire Station servicing the new Sapphire Bay Development and will have an ICC 500 rated storm shelter, as required by code. The facility will be serviced by a generator. The Fire Station will consist of the following components: a. (4) drive-thru bays, b. Living Quarters to accommodate (12) Firefighters and (2) Officers, c. Kitchen area with (3) separate stand-alone pantries, Dining Room, and Dayroom, d. Auxiliary building support rooms, i.e., Laundry, Watch Room, Server Room, EMS Storage, etc., e. Bunker Gear room sized to accommodate (40) lockers, an extractor and drying cabinet, f. Fitness Room (shared), g. Decontamination Area, h. SCBA/Tool Room. The Police Station will consist of the following components: a. Briefing room (also functions as the storm shelter), b. Interior alternative vehicle storage, c. (2) Lieutenant offices, open area for (6) Sergeant offices, d. Mens and Womens locker rooms, e. Training room and Kitchen/breakroom separated by a movable partition wall. Vertical circulation will be provided by an elevator, two (2) stairs, and two (2) fire poles. A construction schedule will be developed once the initial round of pricing is received. The city intends to proceed with design and construction immediately and complete this station as quickly as possible. Question Deadline 03/20/2023 at 2:00 PM CT All questions shall be emailed to Purchasing@rowlett.com Notice to Proceed with Construction is anticipated to be given to the CMaR on July 11, 2023, and Substantial Completion is desired (12) months later.

Post-Bid

Fire / Police

$9,000,000.00

Public - City

New Construction, Site Work

10

9

2

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
27
Bidding Soon
1,310
All Active Projects
470
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

July 11, 2023

img_map_placeholder

1301 E St, Floresville, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.