BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a bridge / tunnel in Buffalo, New York. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

The Owner is the City of Buffalo and the work site is located in the City of Buffalo. The project limits are: the South Park Loop Road Bridge and approach pavement reconstruction to accommodate the new bridge. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: o Demolition of the existing bridge o Construction of a new 20 ft. precast concrete arch bridge on pile foundations on a similar alignment as the existing 20 ft. concrete arch bridge o Construction of a temporary bridge will be installed to detour pedestrian, bicyclists and golf carts around the construction site o Provide a new bridge that matches the historic character of the existing bridge o Reconstruction/resurfacing of the approach roadway in proximity to the bridge o Installation of new lamp posts adjacent to the project bridge o Maintenance and Protection of Traffic o All other labor and material necessary or proper for performing and completing the work. This is a Federal Aid Project and NYSDOT Standard Specifications, officially finalized and adopted on January 1, 2023 as posted on the New York State Department of Transportation's website must be followed by the successful bidder. The DBE goal for this project is: 5% NOTE: Bidders must submit their DBE Participation Commitments on Company Letterhead with the bid. The EEO Employment goals for this project are: 7.7 % Minority Employment Goal 6.9% Women Employment Goal The use of the NYSDOT approved civil rights reporting software, Equitable Business Opportunities (EBO), is required. Access authorization to EBO can be found electronically Applicable Federal requirements take precedence over State and Local requirements unless State and Local requirements are deemed to be more stringent. Pre Bid Meeting Info: A meeting invitation will be sent by Wednesday, March 8, 2023 at 9:00 AM to all that requested to be added. Please have a responsible representative attend this meeting. No questions or inquiries regarding this bid will be accepted within three (3) business days prior to the bid opening. The City of Buffalo will not be responsible for full or partial set of Contract Documents, including any Addenda obtained from any other source. The City of Buffalo reserves the right to reject any and all bids and to waive any informalities therein. Addenda will be emailed from Avalon Document Services to Bidders listed on the official Plan Holders List. Bidders must acknowledge receipt of all Addenda by securely stapling in place all addenda within the front or back covers of the proposal book. All Addenda so issued shall become part of the Contract Documents. Questions regarding the Contract Documents should be directed to [tcoyle@gpinet.com]. Bidders shall promptly notify [tcoyle@gpinet.com] of any errors, omissions, conflicts or ambiguity within the Contract Documents within [3] days of bid opening. All bids must include the completed Bid Form, Non-Collusive Bidding and Disbarment Certifications, and Lobbying Certifications. This is a unit price bid as described in the Instructions to Bidders. No bidder may withdraw his/her bid within forty-five (45) calendar days after the actual date of the opening thereof. The DPW will set a box up for the bidder to deposit the sealed proposal. There may be multiple bids on this date; it is the bidder's responsibility to properly label the sealed proposal and place the proposal inside the correct box 2.) Mail the sealed proposals to Room 10, City Hall, Buffalo, New York, 14202 with ATTN to the Commissioner of Public Works, Parks and Streets. Bidders should allow for delivery before the bid opening (highly encouraged to schedule for delivery on or prior to Tuesday, March 28, 2023). It is also highly encouraged that bidders track delivery of their mailed proposals and use appropriate priority mail as necessary. City of Buffalo staff is available to accept deliveries on standard business days Monday-Friday from 8:00 AM to 4:00 PM. The successful Bidder will be required to comply with all provisions of the Federal Government Equal Employment Opportunity clauses issued by the Secretary of Labor on May 2, 1968 and published in the Federal Register (41 CFR Part 60-1, 33 F.2 7804). Successful bidders will be required to pay prevailing wage rates on this contract. The City of Buffalo reserves the right to consider the bids for forty-five (45) days after receipt before awarding any Contract, and to waive any minor informalities in, and to reject, any and all bids. All bids are subject to final review and approval by the City of Buffalo Common Council before any award of contract may be made. Receipt of bids by the City of Buffalo shall not be construed as authority to bind the City of Buffalo. The work will be substantially completed [130] working days from Notice to Proceed The New York State Department of Transportation, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C 2000d to 2000d-4 and Title 49 Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the Department of Transportation and Title 23 Code of Federal Regulations, Part 200, Title VI Program and Related Statutes, as amended, issued pursuant to such Act, hereby notifies all who respond to the related solicitation, request for proposal or invitation to bid that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, sex, age, disability/handicap and income status in consideration for an award. Questions regarding the Contract Documents should be directed to [tcoyle@gpinet.com]. Bidders shall promptly notify [tcoyle@gpinet.com] of any errors, omissions, conflicts or ambiguity within the Contract Documents within [3] days of bid opening. No questions or inquiries regarding this bid will be accepted within three (3) business days prior to the bid opening.

Award

Bridges / Tunnels

$2,000,000.00

Public - City

Demolition, New Construction, Site Work

34

13

24

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
89
Bidding Soon
2,312
All Active Projects
961
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

June 1, 2023

img_map_placeholder

South Park Ave, Buffalo, NY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.