EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 21, 2024 at 8:00 PM

Updated October 1, 2024

Site work, paving and new construction of a mixed-use development in Scott Air Force Base, Illinois. Completed plans call for the construction of a 24,771-square-foot day care center; for site work for a day care center; playground / park / athletic field; water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

W912QR23R00028, W912QR-23-CDC-SCOTTAFB, W912QR23R0028, 502189 DESCRIPTION: The U.S. Army Corps of Engineers (USACE) Louisville District is issuing a Request for Proposal (RFP) -W912QR23R0028- for /build for the construction of a Child Development Center (CDC) at Scott Air Force Base. The project is to and construct an approximately 24,711 SF facility in the initial build to provide the ability to accommodate 156 children on a proposed project site of +/-5.25-acres at the southeastern corner of Paul Revere Drive and Patriots Drive. The project will include 12 classrooms (7 Under 2, 3 Toddler, and 2 Preschool) and all administrative, kitchen, laundry, and mechanical facilities sized to support ultimate future buildout to accommodate 232 children. The project also includes all accompanying support spaces, outdoor play environments, site improvements, parking, access drives, stormwater detention facilities, and utility connections necessary to support the facility program. The proposed site plan and building floor plan have the ability to expand to a 30,243 SF facility with the capacity to accommodate a maximum of 232 children. The project is intended to comply with program and requirements for a Medium C D C as referenced in FC 4-740-14F, 07 July 2015 Draft, Air Force Child Development Centers. Contract duration is estimated at 954 calendar . A pre-proposal site visit may be held. and site visit details will be provided in the solicitation. TYPE OF CONTRACT AND NAICS: This RFP will be for one (1) Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 236220 Commercial and Institutional Building Construction. TYPE OF -: Full and Open Competition (Unrestricted) CONSTRUCTION : The of this construction project is anticipated to be between $10,000,000 and $25,000,000, in accordance with DFARS 236.204. SELECTION PROCESS: This will be a two-phase /Build procurement process. The proposals will be evaluated using a Best Tradeoff selection process. Potential offerors are invited to submit their , technical, and capability information as will be described in section 00 22 16 of the Solicitation, for review and consideration by the Government. The selection process for Phase I will evaluate such factors (not necessarily in order): Past and Management Plan. Pro Forma Information such as bonding and financial capability will also be required to meet the minimum requirements of the solicitation. Following completion of the evaluation of Phase I, up to a maximum of five (5) most highly qualified offerors will be invited to participate in Phase II. The selected offerors for Phase II will be invited to submit additional information as will be described in Section 00 22 18 of the Solicitation, for review and evaluation by the Government. The selection process for Phase II will evaluate such factors (not necessarily in order): /Technical, Small Business Participation Plan, and Price. Pro Forma Information such as Standard Form 1442, Joint Venture Agreements, bonding and financial capability, Pre- Information, and Subcontracting Plan will also be required to meet the minimum requirements of the solicitation. All evaluation factors, other than cost or price, are considered approximately equal to cost or price. DISCUSSIONS: The Government intends to without discussions but reserves the right to conduct discussion should it be deemed in the Government's best interest. SOLICITATION WEBSITE: The official solicitation, when posted, will be free of charge by electronic posting only and may be found at the Federal Business Opportunities website, http://sam.gov. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the Federal Business Opportunities website at http://sam.gov. Amendments, if/when issued, will be posted to the above referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check the website periodically for any amendments to the solicitation. REGISTRATIONS: Offerors shall have and shall maintain an active registration in the following database: System for Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract . If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to to the next prospective Offeror. POINT-OF-CONTACT: The point-of-contact for this procurement is the Contract Specialist, Amy Phillips at Amy.M.Phillips@usace.army.mil and Contracting Officer, Josh Westgate at Joshua.K.Westgate@usace.army.mil. *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Day Care Centers

$20,941,000.00

Public - Federal

New Construction, Paving, Site Work

140

64

32

8

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Environmental Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Polychlorinate Biphenyl Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Membrane Roofing, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Louvers, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers, Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Furniture, Systems Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Sanitary Sewerage, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central Cooling Equipment, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Electricity Metering, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Off-Gassing Mitigation, Radon Mitigation, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Compaction, Erosion and Sedimentation Controls, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Irrigation, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Culverts, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
46
Bidding Soon
752
All Active Projects
372
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2024

May 8, 2024

img_map_placeholder

Paul Revere Drive and Patriots Drive., Scott Air Force Base, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

SAFB Child Development Center Scott AFB, Il

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.