Site work and paving for a sidewalk / parking lot in Williamsport, Maryland. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Chad Rooney, Town Manager, can be reached at 301-223-7711 or crooney@williamsportmd.org with any questions. A. Exhibit 1 illustrates the area where existing blacktop pathways will be removed and replaced by concrete sidewalks compliant with current Americans with Disabilities Act regulations. B. The contractor will need to excavate the existing blacktop pathways and adjacent grass and dirt next to the path to a depth necessary to allow for compaction of the subbase, installation of 4 inches of compacted gravel and then for a 4" thick concrete sidewalk to be built. C. All materials will be removed and hauled away for disposal by the contractor. D. Install/Construct a continuous concrete sidewalk leading from the parking lot to concession area and then continuing to the small parking lot behind the main baseball field. The total length is estimated at 365 linear feet, but measurements by potential contractors is encouraged. E. Install/Construct concrete sidewalk about midway on the pathway described in Section A, Section 3, leading from this path to the playground area. The total length is estimated at 45 linear feet, but measurements by potential contractors is encouraged. F. The work should include everything necessary to complete the project such as (but not limited to): supplying of all materials, saw-cutting and removal of existing pavement, sidewalk, and tree removal where necessary. Work also to include clearing, grubbing, and other site preparation, performing final seeding, mulching, and cleanup. G. The work should include everything necessary to complete the project such as (but not limited to): supplying of all materials, saw-cutting and removal of existing pavement, sidewalk, and tree removal where necessary. Work also to include clearing, grubbing, and other site preparation, performing final seeding, mulching, and cleanup. H. Potential contractors must satisfy themselves of the accuracy of the estimated quantities for the completion of the project. The Town will assume no responsibility regarding discrepancies on estimated quantities. I. After submissions have been received, potential contractors shall not assert that there was a misunderstanding concerning the quantities of work or of the nature of the work to be done. J. The successful contractor will be notified through the United States Postal Service and electronic mail of their selection to complete this project within seven days of the decision. K. The Notice of Award / Notice to Procced will be required to be executed within ten calendar days from the date when the NOTICE OF AWARD is delivered to the successful contractor. L. In case of failure of the successful contractor to execute the Agreement, the Town may consider the successful contractor in default. The Town, within ten (10) days of receipt of acceptable Agreement signed by the party to whom the Agreement was awarded, shall sign the Agreement, and return to such party an executed duplicate of the Agreement. Should the Town not execute the Agreement within such period, the successful contractor may, by WRITTEN NOTICE, withdraw the signed Agreement. Such notice of withdrawal shall be effective upon receipt of the notice by the Town. M. Failure on the part of the Contractor to properly perform the work pursuant to the progress schedule shall result in a penalty of one hundred dollars ($100.00) per day liquidated damages for each week that construction progress is regarded as a direct result of the Contractor's failure to execute the work. The above penalties will not apply to causes beyond the Contractor's control such as, but not limited to, Acts of God, information withheld by the Owner, Construction Agent, or Engineer. N. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the PROJECT shall apply to the contract throughout.

Award

Sidewalks / Parking Lot

$27,858.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
74
Bidding Soon
1,759
All Active Projects
692
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2023

April 17, 2023

img_map_placeholder

To Be Determined, Williamsport, MD


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.