EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 25, 2023 at 8:00 PM

Updated October 1, 2024

Demolition, site work and addition to a mixed-use development in Okanogan, Washington. Working plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

SECTION 00 00 10 – ADVERTISEMENT FOR BIDS NOTICE TO SUBCONTRACTORS / SUPPLIERS Sealed Bids for the Base will be received General Contractors by the Owner no later than 1:00 PM, on Thursday, March 23 at the Administration Building of Okanogan School District No. 105, 115 Rose St, Okanogan, WA 98840; sealed bids for the alternate bids will be received from select General Contractors by the Owner no later than 1:30 PM, at Okanogan School District No. 105, 115 Rose St., Okanogan, WA 98840. For the construction of: Okanogan School District No. 105 Okanogan Classroom Addition Okanogan, WA 98840 A single combined Bid is requested for all associated work within each section. Note that the costs associated with the bid and any additional work, exclusion and/or clarifications must be clearly provided with bid. Bids will be opened with the Owner and the bidders present at the aforementioned time and place and read orally. The Owner will analyze and a bid will be selected based on bid price, budget, scope of work proposal, exclusions/additions and other criteria deemed important to the Owner and per Bidding Specifications. Bids received after the aforementioned time will not be considered. Each Bid shall be submitted in accordance with project bidding and contract document requirements and shall be accompanied by a Bid Bond, Certified Check, or Cashier's Check made payable to Okanogan School District No. 105, 115 Rose St., Okanogan, WA 98840, in the amount of not less than 5 percent (5%) of the total amount of the base bid. A meeting for all parties interested in bidding on the project will be held at the Administration Building of Okanogan School District No. 105, 115 Rose St, Okanogan, WA 98840 (same place as Bid Opening) and then we shall go tour the site. Meeting time, Thursday, March 9, 2023, at 1:00 PM. Attendance is recommended for all General Contractors interested in submitting a Bid on the project. Attendance is recommended for (other) sub-contractors interested in bidding on a portion thereof. All interested parties are also welcome to attend. Questions are to be directed to the Project Manager: Alejandro Sanchez at asanchez@loofburrow.com and copied to Contract Administrator: Elisa Diaz at ediaz@loofburrow.com Bona fide Bidders and Sub-Bidders will be issued one set of the Bidding Documents upon a deposit of $100.00 in the form of a company check payable to: Loofburrow Wetch Architects, P.S.; send deposit to: ARC, 632 Broadway, Tacoma Washington 98402. Should a Bidder require additional sets or parts of sets of the Bidding Documents, Bidders may obtain them from ARC by paying the cost of reproduction to ARC (not refundable). Copies of the Bidding Documents may also be purchased (not refundable) at ARC, 632 Broadway, Tacoma, Washington 98402, (253) 383-6363. Orders can be placed online at www.e-arc.com For plan reproduction assistance, call ARC Bid Services at (800) 337-8103 or your local plan centers. If kept longer than ten (10) days following the Bid Date or if the Bidding Documents are damaged, the full deposit will be forfeited. Bidders who do not submit a Bid and do not return the Bidding Documents to Loofburrow Wetch Architects, 201 W. Yakima Ave, Yakima Washington 98902 by the Bid Date will forfeit the full amount of their deposit. The Bidding Documents, including plans and specifications, are also on file at the following plan centers: ABADAN REPROGRAPHICS & IMAGING, 603 E. Second Ave., Spokane, WA 99202ASSOCIATED BUILDERS & CONTRACTORS, 12310 E. Mirabeau Parkway, Suite 100 Spokane Valley, WA 99216ASSOCIATED GENERAL CONTRACTORS OF AMERICA, INC., 4935 E. Trent, Spokane, WA 99212CONSTRUCTION DATA / FW DODGE – SPOKANE, 4935 E. Trent, Spokane, WA 99212DAILY JOURNAL OF COMMERCE, 83 Columbia Street, Seattle, WA 98104DAILY JOURNAL OF COMMERCE, 921 SW Washington Street, Suite 210, Portland, OR 97205RIDGELINE GRAPHICS, 34 North Chelan Avenue, Wenatchee, WA 98801SPOKANE REGIONAL PLAN CENTER, 209 North Havana, Spokane, WA 99202S.W. WASHINGTON CONTRACTORS, 7017 NE Highway 99, Suite 214, Vancouver, WA 98665TRI-CITY CONSTRUCTION COUNCIL, 20 E. Kennewick Avenue, Kennewick, WA 99336WALLA WALLA VALLEY PLAN CENTER 29 E. Sumach Street, Walla Walla, WA 99362YAKIMA PLAN CENTER, 1212 North 16th Avenue, Suite 2, Yakima, WA 98902 The Board of Directors for Okanogan School District No 105 may, reject any and all bids. The Board of Directors may also make further calls for bids in the same manner as the original call. The Board of Directors also reserves the right to waive any informalities or irregularities. No Bidder may withdraw his Bid after the hour set for receiving the bids or before the award of contract, unless said award is delayed for a period exceeding 45 days. (50326) March 1 and 8, 2023 Base Bid Estimate - $2.3 - $2.4 million Alternate Bid Estimate - $200,000 - $250,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Educational

$2,887,000.00

Public - City

Addition, Demolition, Site Work

58

28

23

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Vapor Retarders, Membrane Roofing, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Special Wall Surfacing, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Central Heating Equipment, Breechings, Chimneys, and Stacks, Gas Vents, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Watering, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
6
Bidding Soon
81
All Active Projects
31
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

October 25, 2023

img_map_placeholder

Multiple Locations, Okanogan, WA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Okanogan Classroom Addition

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.