BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Durham, North Carolina. Contact the soliciting agency for additional information.

Contract Id: ME00022 WBS Element No.: Various County: Durham, Franklin, Granville, Person, Vance, Wake & Warren County Type of Work: Traffic Control This contract is for installation of work zone traffic control devices, on state maintained highways on an "As Needed Basis" for projects in Wake County with Durham, Franklin, Granville, Person, Vance and Warren Counties. The Contractor will also be responsible for shoulder, one lane closures and multiple lane closures on various roadway facilities, including interstate facilities as directed by the Engineer. The Contractor must be able to provide a minimum of two simultaneous lane closures, potentially in separate counties. All work and materials shall be in accordance with the provisions of the General Guidelines of this contract, the Project Special Provisions, the North Carolina Department of Transportation 2018 Standard Specifications for Roads and Structures, the North Carolina Department of Transportation 2018 Roadway Standards Drawings, and the current edition of the Manual of Uniform Traffic Control Devices (MUTCD), with the exception that bid bonds are not required. Bid Bonds Are Not Required. All bids shall be prepared and submitted in accordance with the following requirements. Failure to comply with any requirement may cause the bid to be considered irregular and may be grounds for rejection of the bid. The Bidder shall not add any provision reserving the right to accept or reject an award, or to enter into a contract pursuant to an award. Prospective bidders shall obtain prequalification approval at least two business days prior to any letting in which they intend to submit a bid. It is recommended that the prospective bidder file all required statements and documents with the State Prequalifications Engineer no less than 4 weeks before a given letting. The date of availability for this contract is April 26, 2023. The completion date for this contract is April 25, 2024. Combined MBE/WBE Goal is (0.0%) Anticipated MBE (0.0%) Anticipated WBE (0.0%) For questions regarding Division 5 project lettings, please contact me at 919-707-7392 or at mbiedell@ncdot.gov. NCDOT - Annual Needs Traffic Control

Post-Bid

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
52
Bidding Soon
1,157
All Active Projects
403
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

April 26, 2023

img_map_placeholder

Multiple Locations, Durham, NC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.