BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Opa Locka, Florida. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

**As of May 19, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Miami-Dade County, as represented by Miami-Dade Aviation Department ("MDAD") requires the services of a general contractor to provide construction services including, but not limited to project management, onsite supervision, labor, material, tools, equipment, trade subcontractors, licenses, permit, overhead, profit, etc. in accordance with the following documents referred to herein as contract bid documents. The project consists of pavement rehabilitation for Runway 09L-27R, sections of parallel Taxiway N, sections of perpendicular Taxiways J, G, F, C, H, and E, removal of the existing rigid pavement located at both thresholds and replacing it with flexible pavement; milling and overlaying Runway 09L-27R as well as taxiway connectors. The project includes grooving, grading improvements, runway edge lights replacement or adjustment, replace the base cans, conduits, and cables, as required, and new pavement markings. A new Precision Approach Path Indicator (PAPI) will replace the existing Visual Approach Slope Indicator (VASI) system. Disadvantaged Business Enterprise - Construction participation goal for this project is: 7.11% Each Bid must be accompanied by a Bid Guaranty of not less than five percent (5%) of the Total Bid in a manner required by the Instructions to Bidders. No Bid may be withdrawn after the scheduled closing time for the receipt of Bids for a period of one hundred and eighty (180) days. Completion of the Work within the Contract Time is of the essence. The Contract Time for this Work is 450 calendar days from the effective date established in the Notice to Proceed. Construction phase durations have been established for this contract and are available in the Construction Safety and Phasing Plans (CSPP) and Construction plans/drawings prepared by ATKINS. The following Liquidated Damages for Phase 1 and Phase 2 will be deducted from the Contract amount for each calendar day/hour of delay due to a Non-Excusable Delay. Measurement shall be per day or part thereof, and hour or part thereof. Phase 1 & 2a (Concurrent) - Runway 9L/27R and Taxiways N1, N8, N (east & west), J, H, G, F, E and C Rehabilitation - 200 days: $1,345 per hour of delay in opening the Runway. Phase 2b - Taxiways N1 & N (west) Rehabilitation - 40 days: $1,345 per hour of delay in opening Runway 12- 30 and $6,800 per day of delay in opening Taxiways N1 & N (west). Liquidated Indirect Costs recoverable by the Contractor, shall be $4,400 per day for each day the project is delayed up to 180 days due to a Compensable Excusable Delay. After 180 days, the recoverable Liquidated Indirect Costs by the Contractor, resulting from a Compensable Excusable Delay, shall be $4,400 per day. Under Contract No. E16-MDAD-03, SO-08, SO-09, SO-10, SO-12 & SO-15 The County reserves the right to reject any or all Bids, to waive informalities and irregularities, to reject all Bids, or to re-advertise for Bids.

Bid Results

Transportation Terminals

$30,291,655.00

Public - County

Paving, Site Work

200

18

20

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
251
Active Projects
129
Bidding Soon
1,785
All Active Projects
750
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 31, 2023

May 1, 2023

img_map_placeholder

14201 NW 42nd Ave, Opa Locka, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.