BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2024 at 8:00 PM

Updated August 10, 2024

Site work, renovation and addition to a transportation facility in Fargo, North Dakota. Completed plans call for the renovation of a transportation facility; for site work for a transportation facility; and for the addition of a transportation facility.

As of August 9, 2024, construction is underway. Construction started about two months ago. All trades have been awarded. The owner has selected a Construction Manager. McGough/TF Powers were selected for these services. Job Number: 2010.25, 2006.4 The work involved shall include the following: The Project includes a 4-gate, 73,000 square foot addition and a 5-gate 113,00 square foot existing building renovation (there will be 9-gates total upon completion). This includes reconfiguring interior spaces, updating/replacing finishes and updating building systems in the existing terminal, and construction of the Terminal expansion (east). The Project will need to be phased. Some of the more sensitive operational priorities include maintaining the operation of 5 gates at all times throughout construction. The existing security checkpoint will need to be relocated in a manner that will maintain operation during airport public hours and work with a TSA approved contractor to coordinate the relocation once the new space is ready. Phasing was developed with the intent of minimizing disruptions to existing operations and keeping all five gates open throughout construction. Phasing and implementation will be more clearly defined when a Construction Manager is brought onto the team. 2801 32nd Avenue N, 2nd Floor, Fargo, North Dakota, 58102 All questions regarding this RFP should be directed to: Brandon Halverson, Project Manager, Mead and Hunt, Inc. Email: Brandon.Halverson@meadhunt.com Question Deadline: March 31, 2023, Time: 3:00 p.m. (Central Time)

Under Construction

Transportation Terminals

$82,950,000.00

Public - City

Addition, Renovation, Site Work

398

11

8

3

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
20
Bidding Soon
244
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2023

June 10, 2024

Project location map

2801 32nd Ave N, Fargo, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.