BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Omaha, Nebraska. Contact the soliciting agency for additional information.

for the furnishing of all labor, tools, materials, equipment, and all else necessary to properly maintain all of the improvements within the District generally designated GREEN AREA MAINTENANCE 2023, Sanitary and Improvement District No. 333 of Sarpy County, Nebraska HILLS OF ASPEN CREEK. At such hour, or as soon as practicable thereafter, the bids will be publicly opened, read aloud and tabulated, in the presence of all bidders, and consider the bids received for the furnishing of such labor, materials, and equipment necessary for the proper construction of such improvements. The extent of the work consists of the construction or other effectuation of the items listed below and other related preparatory and subsidiary work from issuance of the Notice to Proceed: ITEM DESCRIPTION APPROXIMATE QUANTITY UNIT PRICE AMOUNT APRIL 1, 2023 TO MARCH 31, 2024 1 FINE MOWING, TRIMMING, WEEDING AND CLEANUP (4" HIGH) (MINIMUM ONCE EVERY TWO WEEKS) 30 EA $350.00 $10,500.00 2 FERTILIZER, WEED KILLER AND BROADLEAF SPRAYING (ONE YEAR PROGRAM) 1.0 LS $1,500.00 $1,500.00 3 REPAIR EROSION AND WASHOUTS WITH TOPSOIL 40.0 HR $45.00 $1,800.00 4 TOPSOIL FOR EROSION REPAIR 20.0 CY $30.00 $600.00 5 OVERSEEDING (AREAS LESS THAN ONE ACRE) 1 AC $1,200.00 $1,200.00 6 OVERSEEDING (AREAS ONE ACRE AND GREATER) 3 AC $800.00 $2,400.00 7 WOOD MULCH 100.00 CY $65.00 $6,500.00 8 PRUNING OF PLANT MATERIAL 40.0 HR $55.00 $2,200.00 9 SNOW REMOVAL FROM TRAILS AND WALKWAYS (2" TO 6" SNOWS) 5 EA $250.00 $1,250.00 10 SNOW REMOVAL FROM TRAILS AND WALKWAYS (OVER 6" SNOWS) 2 EA $350.00 $700.00 11 ICE REMOVAL FROM TRAILS AND WALKWAYS (CHEMICAL APPLICATION) 200.0 LBS $1.25 $250.00 12 WINTER CLEANUP 6 EA $125.00 $750.00 13 LABORER 100.00 HR $55.00 $5,500.00 14 SKID STEER LOADER AND OPERATOR 10.00 HR $100.00 $1,000.00 15 CONSTRUCT SILT FENCE 100.0 LF $4.00 $400.00 ITEM NO. DESCRIPTION APPROXIMATE QUANTITY UNIT PRICE AMOUNT 16 CLEANOUT SILT FENCE 100.0 LF $3.00 $300.00 17 REMOVE SILT FENCE 100.0 LF $2.00 $200.00 TOTAL ESTIMATED CONSTRUCTION COST - (APRIL 1, 2023 TO MARCH 31, 2024) $37,050.00 ESTIMATED ENGINEERING, LEGAL, PUBLICATION AND MISCELLANEOUS COSTS - (APRIL 1, 2023 TO MARCH 31, 2024) $7,410.00 TOTAL ESTIMATED PROJECT COST - (APRIL 1, 2023 TO MARCH 31, 2024) $44,460.00 ITEM NO. DESCRIPTION APPROXIMATE QUANTITY UNIT PRICE AMOUNT APRIL 1, 2024 TO MARCH 31, 2025 1 FINE MOWING, TRIMMING, WEEDING AND CLEANUP (4" HIGH) (MINIMUM ONCE EVERY TWO WEEKS) 30 EA $350.00 $10,500.00 2 FERTILIZER, WEED KILLER AND BROADLEAF SPRAYING (ONE YEAR PROGRAM) 1.0 LS $1,500.00 $1,500.00 3 REPAIR EROSION AND WASHOUTS WITH TOPSOIL 40.0 HR $45.00 $1,800.00 4 TOPSOIL FOR EROSION REPAIR 20.0 CY $30.00 $600.00 5 OVERSEEDING (AREAS LESS THAN ONE ACRE) 1 AC $1,200.00 $1,200.00 6 OVERSEEDING (AREAS ONE ACRE AND GREATER) 3 AC $800.00 $2,400.00 7 WOOD MULCH 100.0 CY $65.00 $6,500.00 8 PRUNING OF PLANT MATERIAL 40.0 HR $55.00 $2,200.00 9 SNOW REMOVAL FROM TRAILS AND WALKWAYS (2" TO 6" SNOWS) 5 EA $250.00 $1,250.00 10 SNOW REMOVAL FROM TRAILS AND WALKWAYS (OVER 6" SNOWS) 2 EA $350.00 $700.00 11 ICE REMOVAL FROM TRAILS AND WALKWAYS (CHEMICAL APPLICATION) 200.0 LBS $1.25 $250.00 12 WINTER CLEANUP 6 EA $125.00 $750.00 13 LABORER 100.00 HR $55.00 $5,500.00 14 SKID STEER LOADER AND OPERATOR 10.00 HR $100.00 $1,000.00 15 CONSTRUCT SILT FENCE 100.0 LF $4.00 $400.00 16 CLEANOUT SILT FENCE 100.0 LF $3.00 $300.00 17 REMOVE SILT FENCE 100.0 LF $2.00 $200.00 TOTAL ESTIMATED CONSTRUCTION COST - (APRIL 1, 2024 TO MARCH 31, 2025) $37,050.00 ESTIMATED ENGINEERING, LEGAL, PUBLICATION AND MISCELLANEOUS COSTS - (APRIL 1, 2024 TO MARCH 31, 2025) $7,410.00 TOTAL ESTIMATED PROJECT COST - (APRIL 1, 2024 TO MARCH 31, 2025) $44,460.00 ITEM NO. DESCRIPTION APPROXIMATE QUANTITY UNIT PRICE AMOUNT ALL PHASES TOTAL ESTIMATED CONSTRUCTION COST - ALL PHASES $74,100.00 ESTIMATED ENGINEERING, LEGAL, PUBLICATION AND MISCELLANEOUS COSTS - ALL PHASES $14,820.00 TOTAL ESTIMATED PROJECT COST - ALL PHASES (APRIL 1, 2023 TO MARCH 31, 2025 $88,920.00 Upon approval, the Owner will issue payment to the Contractor in the amount of 90% of the contracted value of the completed work as of the end of the preceding month, as recommended by the Engineer. Payment for the balance retained will be issued by the Owner upon completion of the work and approval thereof by the Owner's Engineer, City or Governmental approval when necessary, and acceptance by the Owner Contractor must give 24-hour notice to Engineer when picking up paper sets. Each bid shall be accompanied, in a separate sealed envelope, by a certified or bank check drawn on a bank whose deposits are insured by the F.D.I.C. or an acceptable bid bond in the amount of $4,400.00 and shall be payable without condition to SANITARY AND IMPROVEMENT DISTRICT NO. 333 OF SARPY COUNTY, NEBRASKA as a guarantee that the bidder, if successful, will execute the contract and provide an acceptable Contract Bond from an approved surety in the amount of 100 percent of the contract price. No bidder may withdraw his Bid for a period of THIRTY (30) days after the date set for the opening of bids. The Owner reserves the right to reject any or all bids and to waive informalities.

Post-Bid

Roads / Highways

$88,920.00

Public - County

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
42
Bidding Soon
529
All Active Projects
238
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2023

April 3, 2023

img_map_placeholder

Multiple Locations, Omaha, NE

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.