BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Sherburne, New York. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Questions regarding the Contract Documents should be directed to Bryan Tremblay, Barton & Loguidice, D.P.C. either through email at: btremblay@bartonandloguidice.com or by telephone at 315-457-5200. Bidders shall promptly notify Bryan Tremblay of any errors, omissions, conflicts or ambiguity within the Contract Documents within 7 days of bid opening. There is no DBE goal for this project. The MBE and WBE goals for this project are 8% and 15% respectively. The SDVOB goal for this project is 6%. The EEO Employment goals for this project are: 1.2% Minority Employment Goal 6.9% Women Employment Goal The Owner is the Town of Sherburne and the work site is located in the Town of Sherburne, Chenango County New York. The project is located 2 miles east of the intersection of Pleasant Valley Road and NY-12. The projects limits extend from 140 ft west to 100 ft east of the culvert. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the Plans and described in these Specifications including, but not necessarily limited to the following: Removal of the existing structure and replacement with a precast concrete box culvert, and reconstruction of approximately 250 ft of approach roadway to tie into the adjacent roadway. CR Number: 2095716 The project includes removing and replacing the existing structure carrying Pleasant Valley Road over Negro Hollow. The existing crossing will be replaced with a precast concrete box culvert with cast-in-place concrete wingwalls. The project includes approximately 250 linear feet of approach reconstruction to tie the new crossing into the existing roadway alignment. New bridge and approach guide railing will be installed within the project limits. Traffic will be maintained using an off site detour during construction. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 8% Women Owned Sub-Contracting Goal: 15% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Contract term: 16 weeks

Bid Results

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

29

7

2

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
54
Bidding Soon
723
All Active Projects
394
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2023

May 1, 2023

img_map_placeholder

Pleasant Valley Rd, Sherburne, NY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.