EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Mustang, Oklahoma. Completed plans call for site work for a water / sewer project.

Sanitary Sewer (Gravity), Sewer Pump Station, Sewer Force Main, Sewer and Water Construction, Directional Bore, Electrical and Controls, Fencing/Guardrails/Handrails Construction of a 150 GPM lift station, 34 LF of 4" PVC force main, 431 LF of 8" PVC gravity sewer, 4 manholes, and all necessary fitting and appurtenances. Contact Michael Taylor with any questions. This project consists of furnishing all required materials, supplies, equipment, tools, and plan to perform all necessary labor for the construction of S.H. 152 Sewer Relocation. The work shall be done in accordance with plans and specifications on file in the City Manager's Office. Plans, specifications, and other bidding documents are available for public inspection and copies may be obtained by visiting the respective Engineer, Cowan Group Engineering, LLC, 7100 N Classen Blvd, Suite 500, Oklahoma City, Oklahoma 73116. There will be a non-refundable charge for bidding documents and plans All blank spaces for bid prices must be completed, in ink or typewritten, and in both words and figures. Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his/her address, and the name of the project for which the bid is submitted. If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in the bid form. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for opening the bids, as well as bids received after the time set for receipt of bids, WILL NOT be considered and will be RETURNED UNOPENED. Liquidated damages shall be paid by the Contractor at the rate of $500.00 per each and every calendar day required by him to complete the contract in excess of the contract time. The following description, while not intended to cover all details, outlines some items of the work to be accomplished under this Contract: 1. Construction of one (1) Lift Station and valve vault 2. Construction of 4" Force Main 3. Construction of 8" Gravity Sewer Line INTERPRETATION OF CONTRACT DOCUMENTS Questions regarding documents, discrepancies, omissions, or intent of the specifications or drawings shall be submitted in writing to the Owner through the Engineer at least seven (7) days prior to opening of bids to provide time for issuing and forwarding an addendum. Any interpretation of the contract documents will be made only by addendum duly issued or delivered by the Owner to each person receiving a set of documents. The Owner will not be responsible for any other explanations or interpretation of the contract documents.

Award

Water / Sewer

$910,950.00

Public - City

Site Work

22

17

9

9

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Escalators and Moving Walks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Planting, Turf and Grasses, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
31
Bidding Soon
488
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2023

May 3, 2023

img_map_placeholder

W State Hwy 152 & S Chardon Dr, Mustang, OK


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

152 Sewer Relocation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.