BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 30, 2023 at 8:00 PM

Updated October 8, 2025

Renovation of an educational facility in New York, New York. Completed plans call for the renovation of a educational facility.

Questions accepted up to March 17, 2023 on or before 3:00 PM Send ALL questions to purchasing at: purchasingbids@fitnyc.edu Provide labor, materials, tests, tools and equipment to complete the coed Residence Hall Fan Coil Controls Upgrade and Integration on BMS Project. Contractor may begin survey and procurement of materials immediately following award . The installation of all equipment in accordance with the Manufacturer's Installation/Operation & Maintenance Manuals & Instructions shall be followed. 1. Power distribution system - 120/208 Volt, Distribution Switchboards. 2. Raceways and installation components. 3. Wire and Cable. 4. Grounding system in conformance with applicable codes. 5. Wiring devices. 6. Furnishing and setting of all sleeves through the floors and wall, where required including waterproofing and fireproof sealing and cap flashing. 7. The Contractor shall be responsible for maintaining the fire resistance rating of any rated wall, ceiling or floor for which his work partially or fully penetrates. Work which could potentially penetrate or breach a rated wall, ceiling or floor include, but are not limited to flush-mounted recessed panel boards, conduit and pipe, ducts, equipment, supports or reinforcements. For any such situation, the Contractor shall provide the necessary fire stopping material, insulation or system in order to maintain the fire rating of the wall, ceiling or floor. The Contractor is responsible for reviewing the building construction drawings, including those of the architectural and structural trades, in order to determine the fire resistance ratings for the walls, floors and ceilings for which their work will partially or fully penetrate. 8. Cutting and core drilling associated with electrical work. 9. Prime painting, where required for electrical equipment and installation.

Award

Educational

$590,651.00

Public - State/Provincial

Renovation

15

14

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,017
Active Projects
509
Bidding Soon
7,683
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2023

May 29, 2023

Project location map

230 W 27th St, New York, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.