BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in East Alton, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000311821 The St. Louis Regional Airport is accepting sealed quotes for the removal and reinstallation of approximately 1,950 square feet of deteriorating concrete. Total amount is around 48 cubic yards of cement concrete pavement. Two sections in total: 25'x31' and 25'x47'. Existing pavement is estimated at 8 inches in depth. Concrete must meet a 4,000-psi compression strength at 28 days and should avoid materials such as calcium chloride, and aggregate with history of "D" cracking. Replacement of joints should include either 1" diameter dowels, 18" long at 12" centers or tie bars be #5 bars, 30" long at 30" centers replacing what is existing. Quotes will be accepted until Friday, March 10th at 4:00pm and can be delivered to #8 Terminal Drive, East Alton, IL 62024 (building #11) or emailed to airportdirector@stlouisregional.com. The St. Louis Regional Airport reserves the right to accept or reject any or all quotes and to waive any technicalities. Prevailing wage must be paid and included in the quote. This work will take place within the Aircraft Operating Area of the airfield. The selected company must adhere to all Airport Rules and Regulations to include, but not limited to, minimum insurance requirements, proper vehicle placards, vehicle flags or beacons. General Requirements - Insurance Required - Prevailing Wage Required Please contact the Airport Administration Office at 618-259-2531 to schedule any visits or walkthroughs of the site or for further details on the proposed project. Reference Number: 0000311821 Question Acceptance Deadline: 03/08/2023 03:00 PM EST Questions are submitted online: No Contact Information: Danny Adams 6182592531 airportdirector@stlouisregional.com

Post-Bid

Roads / Highways

$200,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
50
Bidding Soon
864
All Active Projects
350
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2023

April 10, 2023

img_map_placeholder

8 Terminal Dr, East Alton, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.