BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Eau Claire, Wisconsin. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.

Clearing and grubbing, removals, sawcut, asphalt pavement pulverizing and relay, excavation, storm sewer culverts, driveways, crushed aggregate base and shoulders, hot mix asphalt pavement, pavement marking, erosion control, traffic control, topsoil/turf/erosion mat/grasses. The work, in general, will include the approximate quantities and items listed below: Clearing and Grubbing 0.70 acres Sawcut 300 lf Excavation 2,550 cy Borrow Excavation 500 cy Culvert Storm Sewer, 12" - 36" HDPE 618 lf Culvert Storm Sewer, 71" x 47" CMP 56 lf Storm Inlet, Type III 1 ea Asphalt Pavement Pulverizing 14,000 sy Crushed Aggregate Base 3,550 cy Crushed Aggregate Base, Shoulders 9,685 lf Concrete Curb and Gutter, 30" Barrier 100 lf Hot Mix Asphalt Pavement, 2" Binder 17,540 sy Hot Mix Asphalt Pavement 2" Surface 17,540 sy Hot Mix Asphalt Pavement, Driveways 430 sy Pavement Marking Lines, 4" Epoxy 10,360 lf Traffic Control 1 ls Topsoil, Turf, Grasses, and Erosion Mat 13,450 sy Riprap, Medium 80 sy This project is part of a WisDOT Local Road Improvement Program (LRIP) TRI-S project, which consists of roadway improvements of existing road including clearing and grubbing, asphalt pavement pulverizing and relay, widening, excavation, storm sewer culverts, driveways, crushed aggregate base, hot mix asphalt pavement, and restoration. The Work will be substantially complete on or before September 1, 2023; final completion on or before October 6, 2023. Location: Cedar Road, Town of Pleasant Valley, Eau Claire County, Wisconsin. The Work includes: a. Excavation b. Trenching, backfilling and compacting c. Asphalt pavement pulverizing d. Clearing and grubbing e. Erosion control f. Traffic control g. Storm sewer culverts h. Sawcut i. Riprap j. Crushed aggregate base k. Hot mix asphalt pavement l. Concrete curb and gutter m. Pavement markings n. Topsoil, turf, grasses, erosion mat Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than five days prior to the date for opening of Bids may not be answered. Russ Kiviniemi, 715-235-9081 or russ.kiviniemi@cedarcorp.com.

Bid Results

Roads / Highways

$676,798.00

Public - City

Paving, Site Work

36

13

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
23
Bidding Soon
860
All Active Projects
257
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 16, 2023

April 17, 2023

September 1, 2023

img_map_placeholder

Cedar Rd, Eau Claire, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.