Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, new construction and addition to a mixed-use development in Miami, Florida. Completed plans call for the construction of a 4,300-square-foot theater / auditorium; for the addition of a theater / auditorium; for the demolition of a theater / auditorium; for site work for a theater / auditorium; office development; office development; office development; office development; warehouse / distribution facility; warehouse / distribution facility; warehouse / distribution facility; and warehouse / distribution facility.
Licensed/qualified contractors needed to complete Confidentiality Affidavit to obtain bid package and drawings in accordance with Florida Statutes §. 119.071(3)(b). The Project consists of the New Construction and expansion of a approx. 4,300 square foot back-of-house, one-story addition to the Joseph Caleb Auditorium, creating additional dressing rooms, restrooms and showers, storage space, offices, an expanded green room, laundry facilities, a technical staff break room, and an expanded loading area directly adjacent to the main stage of the auditorium. On site driveway improvements to the approach of the new loading dock area will provide a more direct access for trucks to reach the facility and increase load-in and out productivity. Performance & Payment Bond Required: YES Bid Bond Required: YES Prevailing Wage Rate Required: Building Construction Davis Bacon: NO Maintenance Wages: NO AIPP: NO SBE-Con. Requirements: YES Percentage: 15.00% SBD Certificate of Assurance Form Required: YES DBE Participation: NO Percentage: 0.00% DBE Subcontractor Forms Required: NO CWP Requirements: NO Percentage: 0.00% SBE-S Requirements YES Percentage: 1.00% SBE-G Requirements NO Percentage: 0.00% Anticipated Start Date: 6/1/2023 Calendar Days for Project Completion: 602 Liquidated Damages: YES $$ Per Day: $1,500.00
Post-Bid
Theaters / Auditoriums
$3,500,000.00
Public - County
Addition, Demolition, New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2023
June 1, 2023
5400 NW 22nd Ave, Miami, FL
Related To This Project
Miami, FL
Bid Date: Apr 28 2023
Miami, FL
Bid Date: Mar 15 2023
Miami, FL
Bid Date: May 11 2023
Miami, FL
--
Miami, FL
Bid Date: Mar 28 2023
Miami, FL
--
Miami, FL
Bid Date: Apr 18 2023
Miami, FL
Bid Date: Mar 24 2023
Miami, FL
Bid Date: Apr 11 2023
Miami, FL
Bid Date: Apr 11 2023
Miami, FL
Bid Date: Mar 13 2023
Miami, FL
Bid Date: Mar 17 2023
Miami, FL
Bid Date: Apr 19 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.