EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 23, 2024 at 8:00 PM

Updated October 24, 2024

Site work and paving for a development in Tewksbury, Massachusetts. Completed plans call for site work for a development.

The construction of two new boardwalks and the repair of one existing boardwalk at the Town of Tewksburys Chandler Well Field. Location, Design and Specifications as shown on plans and drawings by GCG Associates civil engineers dated 6/15/22, and Weatherall Design dated 8/6/24. Specifically, the two new boardwalks to be built are noted by GCG as Peninsula and Vicinity of Eleanor Street. A project Order of Conditions by the Town of Tewksbury Conservation Commission applies. Construction of two new boardwalks and the repair of one existing boardwalk. Each bid shall be accompanied by a bid deposit in the form of a bid bond, or cash, or a certified check on, or a treasurer's or cashier's check issued by, a responsible bank or trust company, payable to the Town of Tewksbury in the amount of five percent (5%) of the value of the bid payable to Town of Tewksbury. Such a bond or check will become the property of Town of Tewksbury if the Bidder fails to execute the contract and satisfactory bonds within ten (10) days after the contract has been submitted to the successful bidder for execution. The Town of Tewksbury reserves the right to reject any and all bids if it be in the public interest to do so.

Award

Conservation and Development

$329,000.00

Public - City

Paving, Site Work

3

7

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Decking
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Excavation and Fill, Dewatering, Fill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Trees

Find More Local Projects

Within 75 Miles of This Project
312
Active Projects
189
Bidding Soon
3,173
All Active Projects
1,351
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2024

October 14, 2024

img_map_placeholder

900 Chandler St, Tewksbury, MA

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Request for Bids Chandler Well Field Boardwalks And Boardwalk Repair

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.