EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Campton Hills, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Fiber-Modified Asphalt Crack Sealing on various bituminous County highway routes, within Kane County. This work shall consist of Fiber-Modified Asphalt Crack Sealing on various Kane County bituminous roads and any additional work necessary to complete the proposed improvements. Question Acceptance Deadline 03/10/2023 04:00 PM EST Reference Number 0000312398 LOCATION OF IMPROVEMENT Various routes in Kane County as shown on the location maps and the Schedule of Quantities including Dauberman Road, Kaneville Road, French Road, Walker Road/Main Street, Huntley Road, Longmeadow Parkway, Randall Road, Main Street Road, Keslinger Road, Meredith Road, Peck Road, Galligan Road, Huntley Road, Fabyan Parkway, Ellithorpe Road, Peplow Road, Dittman Road, Scott Road, Harter-Perry Road and Big Timber Road.

Award

Roads / Highways

$845,724.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
154
Bidding Soon
2,715
All Active Projects
1,138
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2023

May 18, 2023

img_map_placeholder

To Be Determined, Campton Hills, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 HMA Crack Sealing Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.