EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2023 at 8:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to a mixed-use development in Olyphant, Pennsylvania. Completed plans call for the addition of a 6,745-square-foot educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Contract No. 22017.00-03, 22017.00-04 Bids shall be submitted on the form provided and shall be accompanied by a bid bond, certified check, or cashiers check equal to ten percent of the total price submitted inclusive of add alternates. Bids must remain valid for the period of time stated on the bid form. The Mid Valley School District reserves the right to reject any or all bids. The Bidder is responsible to obtain a complete set of Bidding/Contract Documents and verify that they have received all addenda issued. If the Bidder obtains Bidding/Contract Documents from any source other than BDA, the Architect/Owner will not be held responsible for incomplete or missing documents. Project has the following separate prime construction contracts: General Construction Plumbing Construction HVAC Construction Electrical Construction The project consists of, but is not limited to, construction of a 6,745 square foot addition to the Secondary Center, including supporting site improvements. Construction of an outdoor instructional pavilion. Also, the project includes renovations to the existing Secondary Center and miscellaneous improvements to the stadium toilet rooms, replacement of the field house roof, and water and gas line replacement. All requests for Bid Documents shall include the following information: 1. Which contracts bidding. 2. Email address for Bidding/Contract Document and addenda purposes. Scope of Work: This project scope breaks out into four separate project elements. -New addition to existing High School for District Administration Offices -Renovations to existing miscellaneous areas with-in existing High School building. - Construction of new Outdoor Classroom / Pavilion - Finish and plumbing upgrades to existing Field Concession Stand building Bidders requiring clarification or interpretation of the Bidding Documents shall make a written request which must be received by the Architect/Engineer at least five (5) days prior to the date for receipt of Bids. Every written request shall be addressed to BDA Architects, LLC, 200 Abington Executive Park, Suite 101, Clarks Summit, Pennsylvania 18411, Attention: Donald J. Flynn, AIA, NCARB, LEED AP, President, email: djf@bdaarchitects.com. Question Deadline 04/01/2023 GENERAL CONSTRUCTION CONTRACT (Contract No. 22017.00-01) A. Work in the General Construction Contract includes, but is not limited to, the following: 1. All site improvements including but not limited to pavement, concrete, water line replacement and gas line relocation. New construction including structural, masonry interior construction and roofing along with select demolition for the interior renovations. The general contractor is the lead contractor and will be responsible to prepare and update the project schedule. The general shall sawcut, remove and replace slab as noted on drawings for plumbing connections. B. Temporary facilities and controls in the General Construction Contract include, but are not limited to, the following: 1. Provisions for temporary toilet facilities 2. Erosion and sedimentation controls. 3. Security fencing to secure the work area. C. Contract work is specified in the following Specification Sections: 1. Division 00 - Bidding and Construction Documents. 2. Division 01 - General Requirements. 3. Technical Specifications - Divisions 2 through 14, 31, 32, and 33. D. Contract work is included on the following drawings: 1. Drawing CS1.1. 2. C Series Drawings 3. S Series Drawings. 4. A Series Drawings. 1.7 PLUMBING CONSTRUCTION CONTRACT (Contract No. 22017.00-02) A. Work in the Plumbing Construction Contract includes, but is not limited to, the following: 1. Construction including but not limited to domestic water, sanitary and rain water piping and installation. Installation of gas piping. Insulation of piping installed by plumbing contractor. a. Provide and install roof drains. B. Temporary facilities and controls in the Plumbing Construction Contract include, but are not limited to, the following: 1. Provisions for temporary toilet facilities. C. Contract work is specified in the following Specification Sections: 1. Division 00 - Bidding and Construction Documents. 2. Division 01 - General Requirements. 3. Technical Specifications - Division 22. D. Contract work is included on the following drawings: 1. Drawing CS1.1. 2. P Series Drawings HVAC CONSTRUCTION CONTRACT (Contract No. 22017.00-03) A. Work in the HVAC Construction Contract includes, but is not limited to, the following: 1. HVAC construction to include: a. HVAC Equipment and curbing. b. Split systems, refrigerant piping, and insulation. c. Installation of building system hot pumps. d. Ductwork and insulation. e. Hot and chilled water piping and insulation f. Integration of digital controls with existing building system. B. Temporary facilities and controls in the HVAC Construction Contract include, but are not limited to, the following: 1. Temporary ventilation air and comfort cooling/heating. C. Contract work is specified in the following Specification Sections: 1. Division 00 - Bidding and Construction Documents. 2. Division 01 - General Requirements. 3. Technical Specifications - Division 23. D. Contract work is included on the following drawings: 1. Drawing CS1.1. 2. Drawings G2.1 and G3.2 (Temporary and Phasing Plans) 3. M Series Drawings. 1.9 ELECTRICAL CONSTRUCTION CONTRACT (Contract No. 22017.00-04) A. Work in the Electrical Construction Contract includes, but is not limited to, the following: 1. Electrical Construction to include: a. Power and conduit. b. Lighting. c. Data. d. Connection of mechanical equipment. B. Temporary facilities and controls in the Electrical Construction Contract include, but are not limited to, the following: 1. Temporary lighting and power. C. Contract work is specified in the following Specification Sections: 1. Division 00 - Bidding and Construction Documents. 2. Division 01 - General Requirements. 3. Technical Specifications - Divisions 26, 27, and 28. D. Contract work is included on the following drawings: 1. Drawing CS1.1. 2. E Series Drawings. Bid Result - General Construction - Lobar Inc - 4131000 Plumbing Construction - O & M Multi-Trade Inc - 644529 HVAC Construction - Hosler Corporation - 1056000 Electrical Construction - G. R. Noto Electrical Construction - 559000

Bid Results

Educational

$6,390,529.00

Public - City

Addition, Demolition, Renovation, Site Work

157

27

71

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Mockups, Temporary Facilities and Controls, Temporary Utilities, Temporary Electricity, Temporary Lighting, Temporary Water, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Vapor Retarders, Steep Slope Roofing, Shingles and Shakes, Asphalt Shingles, Roofing and Siding Panels, Membrane Roofing, Roof and Wall Specialties and Accessories, Roof Accessories, Ridge Vents, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Fire-Resistant Joint Sealants, Joint Protection, Joint Sealants, Acoustical Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Flush Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Aluminum-Framed Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Flooring Treatment, Resilient Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Panel Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Runners, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Facility Storm Drainage, Facility Storm Drainage Piping, Roof Drains, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Commercial Plumbing Fixtures, Wash Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, Air Terminal Units, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Pathways for Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
126
Bidding Soon
1,680
All Active Projects
740
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2023

April 18, 2023

img_map_placeholder

52 Underwood Rd, Olyphant, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Secondary Center Additions and Renovations

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.