BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Olyphant, Pennsylvania. Completed plans call for the addition of a 6,745-square-foot educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Contract No. 22017.00-03, 22017.00-04 Bids shall be submitted on the form provided and shall be accompanied by a bid bond, certified check, or cashiers check equal to ten percent of the total price submitted inclusive of add alternates. Bids must remain valid for the period of time stated on the bid form. The Mid Valley School District reserves the right to reject any or all bids. The Bidder is responsible to obtain a complete set of Bidding/Contract Documents and verify that they have received all addenda issued. If the Bidder obtains Bidding/Contract Documents from any source other than BDA, the Architect/Owner will not be held responsible for incomplete or missing documents. Project has the following separate prime construction contracts: General Construction Plumbing Construction HVAC Construction Electrical Construction The project consists of, but is not limited to, construction of a 6,745 square foot addition to the Secondary Center, including supporting site improvements. Construction of an outdoor instructional pavilion. Also, the project includes renovations to the existing Secondary Center and miscellaneous improvements to the stadium toilet rooms, replacement of the field house roof, and water and gas line replacement. All requests for Bid Documents shall include the following information: 1. Which contracts bidding. 2. Email address for Bidding/Contract Document and addenda purposes. Scope of Work: This project scope breaks out into four separate project elements. -New addition to existing High School for District Administration Offices -Renovations to existing miscellaneous areas with-in existing High School building. - Construction of new Outdoor Classroom / Pavilion - Finish and plumbing upgrades to existing Field Concession Stand building Bidders requiring clarification or interpretation of the Bidding Documents shall make a written request which must be received by the Architect/Engineer at least five (5) days prior to the date for receipt of Bids. Every written request shall be addressed to BDA Architects, LLC, 200 Abington Executive Park, Suite 101, Clarks Summit, Pennsylvania 18411, Attention: Donald J. Flynn, AIA, NCARB, LEED AP, President, email: djf@bdaarchitects.com. Question Deadline 04/01/2023 GENERAL CONSTRUCTION CONTRACT (Contract No. 22017.00-01) A. Work in the General Construction Contract includes, but is not limited to, the following: 1. All site improvements including but not limited to pavement, concrete, water line replacement and gas line relocation. New construction including structural, masonry interior construction and roofing along with select demolition for the interior renovations. The general contractor is the lead contractor and will be responsible to prepare and update the project schedule. The general shall sawcut, remove and replace slab as noted on drawings for plumbing connections. B. Temporary facilities and controls in the General Construction Contract include, but are not limited to, the following: 1. Provisions for temporary toilet facilities 2. Erosion and sedimentation controls. 3. Security fencing to secure the work area. C. Contract work is specified in the following Specification Sections: 1. Division 00 - Bidding and Construction Documents. 2. Division 01 - General Requirements. 3. Technical Specifications - Divisions 2 through 14, 31, 32, and 33. D. Contract work is included on the following drawings: 1. Drawing CS1.1. 2. C Series Drawings 3. S Series Drawings. 4. A Series Drawings. 1.7 PLUMBING CONSTRUCTION CONTRACT (Contract No. 22017.00-02) A. Work in the Plumbing Construction Contract includes, but is not limited to, the following: 1. Construction including but not limited to domestic water, sanitary and rain water piping and installation. Installation of gas piping. Insulation of piping installed by plumbing contractor. a. Provide and install roof drains. B. Temporary facilities and controls in the Plumbing Construction Contract include, but are not limited to, the following: 1. Provisions for temporary toilet facilities. C. Contract work is specified in the following Specification Sections: 1. Division 00 - Bidding and Construction Documents. 2. Division 01 - General Requirements. 3. Technical Specifications - Division 22. D. Contract work is included on the following drawings: 1. Drawing CS1.1. 2. P Series Drawings HVAC CONSTRUCTION CONTRACT (Contract No. 22017.00-03) A. Work in the HVAC Construction Contract includes, but is not limited to, the following: 1. HVAC construction to include: a. HVAC Equipment and curbing. b. Split systems, refrigerant piping, and insulation. c. Installation of building system hot pumps. d. Ductwork and insulation. e. Hot and chilled water piping and insulation f. Integration of digital controls with existing building system. B. Temporary facilities and controls in the HVAC Construction Contract include, but are not limited to, the following: 1. Temporary ventilation air and comfort cooling/heating. C. Contract work is specified in the following Specification Sections: 1. Division 00 - Bidding and Construction Documents. 2. Division 01 - General Requirements. 3. Technical Specifications - Division 23. D. Contract work is included on the following drawings: 1. Drawing CS1.1. 2. Drawings G2.1 and G3.2 (Temporary and Phasing Plans) 3. M Series Drawings. 1.9 ELECTRICAL CONSTRUCTION CONTRACT (Contract No. 22017.00-04) A. Work in the Electrical Construction Contract includes, but is not limited to, the following: 1. Electrical Construction to include: a. Power and conduit. b. Lighting. c. Data. d. Connection of mechanical equipment. B. Temporary facilities and controls in the Electrical Construction Contract include, but are not limited to, the following: 1. Temporary lighting and power. C. Contract work is specified in the following Specification Sections: 1. Division 00 - Bidding and Construction Documents. 2. Division 01 - General Requirements. 3. Technical Specifications - Divisions 26, 27, and 28. D. Contract work is included on the following drawings: 1. Drawing CS1.1. 2. E Series Drawings. Bid Result - General Construction - Lobar Inc - 4131000 Plumbing Construction - O & M Multi-Trade Inc - 644529 HVAC Construction - Hosler Corporation - 1056000 Electrical Construction - G. R. Noto Electrical Construction - 559000

Bid Results

Educational

$6,390,529.00

Public - City

Addition, Demolition, Renovation, Site Work

157

27

71

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
125
Bidding Soon
1,365
All Active Projects
724
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2023

April 18, 2023

img_map_placeholder

52 Underwood Rd, Olyphant, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.