BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a residential development in Gainesville, Florida. Working plans call for the renovation of a residential development.

**As of April 03, 2023, no bids received. No other information at this time. Question Acceptance Deadline 03/23/2023 05:00 PM EDT Questions are submitted online No Description Gainesville Housing Authority is requesting proposals to remove kitchen and bath cabinet doors, drawer faces and hardware and to furnish labor only to install new GHA furnished kitchen and bath cabinet doors, drawer faces and hardware [hinges and pulls] for twenty-eight (28) occupied units located at S.E. 25th Terrace; Gainesville, FL (Exhibit A). Buyer's Requirements General Requirements - Insurance Required - License Required - Prevailing Wage Required Gainesville Housing Authority is requesting proposals to remove kitchen and bath cabinet doors, drawer faces and hardware and to furnish labor only to install new GHA furnished kitchen and bath cabinet doors, drawer faces and hardware [hinges and pulls] for twenty-eight (28) occupied units located at S.E. 25 th Terrace; Gainesville, FL (Exhibit A). All work is to be performed in accordance with manufactures specifications, industry standards and best work practices. All work is to be performed by skilled and qualified workmen in best practices of the trade and in compliance with Building Regulations and or Government Laws, Statues and Ordinances. Hours of work: Monday through Friday 8:00 a.m. to 5:00 p.m. local time excluding all the GHA recognized Holidays. Summary Scope of Work: For each unit: Furnish labor to remove existing kitchen and bath cabinet doors, drawer faces and hardware. There are seventeen (17) cabinet doors and four (4) drawers. All material is to be properly removed and disposed. For each unit: Furnish labor to install GHA furnished kitchen and bath cabinet doors, drawer faces, cabinet door hinges and cabinet door and drawer pulls. There are seventeen (17) cabinet doors and four (4) drawers. Contractor is responsible for the removal of, and proper disposal of, all debris, packing materials, etc. Contractor is responsible for construction cleaning of work area.

Final Planning

Residential Subdivision

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
108
Bidding Soon
1,516
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2023

October 3, 2023

Project location map

S.E. 25 th Terrace, Gainesville, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.