Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a pre-engineered storage facility in Saint Augustine Beach, Florida. Conceptual plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
The scope of services ("Services") for this project shall require the selected Consultant to provide the following engineering services tasks: 1. Existing Data Review and Gaps Identification - all County data will be available for use by the Consultant. The Consultant will review the County data and other relevant data/reports to determine any additional data needs. 2. New Data Collection - the Consultant will review currently available "plans and specs-level" topographic surveys of the placement area and field-verify locations of seawalls. Upon further authorization, the Consultant will use the results of Task 1 to collect any additional field data. LiDAR was flown post- Hurricane Nicole. The Consultant should plan at least one site visit to the entire project area prior to final design. 3. Permitting Placement Areas Final Design - the Consultant will design the beach fill such that beach compatible sediments are placed on the beach as landward as possible while not exceeding FEMA qualifying quantities, while considering vegetation coverage, viewshed, impacts to native wildlife, and existing structures; prepare plan and cross section views at 100 ft increments; define the landward limit of fill to assist the County in obtaining construction easements from upland property owners; and develop bidding quantities. If needed, the Consultant will design appropriate methods to address parcels with no construction easements. The placement area will include dune plantings. 4. Preparation of Construction Documents, to include: a. Prepare construction-ready plans and specifications (including basis and measurements for payment) consistent with all permits, and of a level suitable for insertion into the County's procurement package to secure a construction contractor. May have to produce multiple sets of plans and specs for each reach as the project may be bid out in separate sections. b. Develop all project construction quantities. c. Estimate construction costs and the construction schedule. d. Develop any other related materials. 5. Bidding Phase Assistance - the Consultant will prepare for and attend the pre-bid meeting, and answer any technical questions potential bidders may have. Review the bids received and provide a bid recommendation. 6. Construction Management Support, to include: a. Public Engagement b. Contractor Initiation and Kickoff Meeting c. Agency Coordination and Notification d. As needed pre-construction beach surveys e. Construction Engineering and Oversight f. Supplemental Beach Surveys g. Validation surveys or spot checks of completed sections of the project h. Construction Phase Environmental Monitoring i. Any other task the consultant identifies as necessary for construction management support 7. Post-Construction Documentation, to include: a. Coordination with contractor and agencies necessary for the closeout of the construction project. b. Project Closeout - Development of final As-Built drawings and coordination with all local, state and federal agencies. c. Notice of Completion: Preparation and submittal of the Notice of Completion and supporting documentation as required by the state and federal regulatory authorizations. d. Deliverable: database with project record including as-built drawings, memo with recommendation for acceptance of project and any other documents necessary to ensure compliance with the applicable permits 8. Environmental Monitoring, to include: a. Seasonal Environmental Monitoring - marine turtle nest monitoring will occur as- described in the FDEP permits. During construction monitoring may be turned over to the construction firm but will need to be picked up by consultant if any monitoring remains after completion of construction. b. Marine turtle nesting survey report. 9. Additional Services- the Consultant will state in its proposal any additional services it thinks are necessary to achieve the project objectives. 10. Coordination with County - the consultant is to have weekly meetings with the County and submit weekly progress summary reports to the County. The method of contractor selection has not been determined at this time.
Conceptual
Warehouse / Distribution - Pre-Engineered Storage Building
$1,000,000.00
Public - County
New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
March 8, 2024
To Be Determined, Saint Augustine Beach, FL
Related To This Project
Saint Augustine Beach, FL
Bid Date: Mar 29 2023
Saint Augustine Beach, FL
Bid Date: Apr 11 2023
Saint Augustine Beach, FL
--
Saint Augustine Beach, FL
Bid Date: Apr 03 2023
Saint Augustine Beach, FL
--
Saint Augustine Beach, FL
Bid Date: Apr 12 2023
Saint Augustine Beach, FL
Bid Date: Apr 19 2023
Saint Augustine Beach, FL
Bid Date: Apr 19 2023
Saint Augustine Beach, FL
Bid Date: Apr 05 2023
Saint Augustine Beach, FL
Bid Date: Mar 22 2023
Saint Augustine Beach, FL
Bid Date: Mar 29 2023
Saint Augustine Beach, FL
Bid Date: Mar 21 2023
Saint Augustine Beach, FL
Bid Date: Jan 13 2022
Saint Augustine Beach, FL
Bid Date: Mar 21 2023
Saint Augustine Beach, FL
Bid Date: Mar 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--