BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in Chisasibi, Quebec. Completed plans call for the renovation of a power facility.

For information purposes and without commitment from Hydro-Québec, the order of magnitude, including the options, is between 3 000 000 $ and 5 000 000 $ Description of the object The work covered by this contract mainly includes the replacement of the XL7 phase C inductor at the Chissibi substation (QU7IW), using qualified personnel and in accordance with the requirements of the contract documents. In addition, the contract includes the following work: - Dismantling of HMI reservoir drainage pipe foundations (QULWO). The supplier must have must be qualified by Hydro-Québec Other terms Only contractors qualified by Hydro-Québec in construction work and services for the category Posts in the civil engineering discipline are eligible to bid. Service providers who wish to qualify in this market must send an email to the address indicated in the list of "qualified" markets to initiate the process Legal requirements See all selected values. Certificate from Revenu Québec or no establishment in Québec form (ARQ/AEQ)Authorization to contract from the Public Procurement Authority (AMP)License from the Régie du bâtiment du Québec (RBQ)Number of the Commission de la construction du Québec (CCQ) Contract requirements See all selected values. Declaration ISO 9001 certification in force Mandatory Disclosure: Conflict of Interest and Solemn Affirmations Execution schedule indicating the periods of construction activities Duration in months (excluding options) Other Other in months (excluding options) 5 Further information Bid validity period 60 days from the date of opening of tenders Information Request/Questions Must be sent to the manager at least three working days before the deadline date and time set for the receipt of tenders Hydro-Québec does not undertake to accept any of the proposals received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Hydroelectric Power Generation

$5,000,000.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
3
All Active Projects
1
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2023

June 6, 2023

img_map_placeholder

To Be Determined, Chisasibi, QC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.