BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Crossville, Alabama. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bridge replacement on County Road 825 over Baker Branch with CMP culverts including removal of old bridge and abutments, 572 tons of coarse aggregate, 53 tons of crushed aggregate, 66 tons super pave bituminous concrete wearing surface, 26 tons super pave bituminous concrete upper binder layer, 47 tons of aggregate surfacing, 80 LF of 108" diameter aluminized, Type 2, corrugated metal pipe (CMP), mobilization, traffic control, 300 tons loose riprap, 700 SY geotextile filter blanket, 2 double 108" roadway pipe concrete headwalls, 300 LF cattle fence reset, 48 CY topsoil, 200 SY erosion control blanket, erosion and sedimentation control, temporary fencing, temporary stream crossing and related items will be received by the Town of Crossville. Unsuccessful bidders will be refunded 100% of the plan deposit for one set returned to the Engineer, in reusable condition, within 10 days after the bid opening. Additional sets obtained shall be refunded 50% of the plan deposit. All non-bidders, subcontractors, vendors or dealers shall be refunded 50% of the plan deposit for each set returned to the Engineer, in reusable condition, within 10 days after the bid opening.

Award

Bridges / Tunnels

$240,583.00

Public - City

Demolition, New Construction, Paving, Site Work

16

13

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
55
Bidding Soon
701
All Active Projects
312
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2023

May 4, 2023

img_map_placeholder

Co Rd 825, Crossville, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.